Similar Projects
District 2243
New Construction - 4,510,000 SF
Conception
$10,000,000 CJ est. value
Leander, TX 78641

Storage Direct
New Construction - 74,721 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Austin, TX 78744

Joe W Fly Co Inc Headquarters
New Construction - 23,000 SF
Design
$1,000,000 to $5,000,000 est. value
Austin, TX 78744

Construction Required Two Development Sites
Post-Bid
Pflugerville, TX 78660

DSHS Storage Facilities Public Health Emergency
Term Contract
Results
Austin, TX 78756

Design and Construction of Pole Barn
Results
$54,750 est. value
Austin, TX

Control Panels USA Facility Expansion
Addition
Construction
Austin, TX 78728

One Gas Service Center
New Construction - 55,507 SF
Construction
$15,409,250 est. value
Austin, TX 78754

Amazon Delivery Station
Renovation
Pending Verification
Austin, TX 78744

XSpace Facility
New Construction - 87,623 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Austin, TX 78734

New Storage Shed - Dallas District
New Construction
Results
Less than $93,000 est. value
Austin, TX 78704

King Ranch Turfgrass
New Construction - 4,500 SF
Construction
$250,000 est. value
Austin, TX 78724

BAE Systems Campus
New Construction - 390,000 SF
Design
$150,000,000 est. value
Austin, TX 78753

Storage Shed, Taylor MNT
Results
Less than $70,000 est. value
Austin, TX 76574

Highway 183 Business Park
New Construction - 121,775 SF
Construction
$10,000,000 CJ est. value
Austin, TX 78744

Last Updated 03/13/2020 08:35 AM
Project Title

Belvedere Storage Building

Physical Address View project details and contacts
City, State (County) Austin, TX 78738   (Travis County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $260,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work of the Contract includes the construction of an 800 square foot prefabricated metal storage building with stone exterior, concrete slab, electrical and lighting for building, approximately 25 LF of pervious sidewalk, a fire hydrant, and site grading in compliance with the provided plans and specifications.

Details

1 Warehouse/Storage, 800 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents