Last Updated 11/11/2020 10:10 AM
Project Title

Smith Lake Water Treatment Facility - Sodium Hypochlorite System Improvements

Physical Address View project details and contacts
City, State (County) Moneta, VA 24121   (Bedford County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The completed Work will provide Owner with a new sodium hypochlorite storage and feed system for the Smith Lake Water Treatment Facility. The project includes demolition of existing storage tanks, equipment pads, piping and portions of the existing Process Building walls; installation of one (1) new temporary sodium hypochlorite storage tank and temporary wall closure followed by installation of two (2) permanent FRP storage tanks, new equipment pads, piping and valves, level measurement and the installation of two (2) new fiberglass translucent panels and associated structural steel framing in the new wall openings. The project will also include the temporary relocation of the sodium hypochlorite metering pumps followed by the installation of four (4) new pumps on a new pump support table. The existing HVAC system serving the sodium hypochlorite storage and feed room shall also be demolished and any wall opening sealed. A new HVAC system and ductwork shall be installed to heat and cool the modified sodium hypochlorite storage and feed room. Other minor structural, architectural, sprinkler piping and electrical improvements necessary to provide a complete installation shall also be provided as part of the project. The procurement and installation of one (1) initial temporary hypochlorite storage tank shall be prioritized to minimize the amount of time that the remaining existing sodium hypochlorite storage tank, which is in poor condition, is used to store sodium hypochlorite.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents