Similar Projects
Stream Data Center - Phoenix II-V/Phase 2-5
New Construction, Renovation, Infrastructure - 1,582,000 SF
Conception
$150,000,000 CJ est. value
Goodyear, AZ 85338

Latino Cultural Center - AR00000005 - City of Phoenix
New Construction, Renovation, Infrastructure
Conception
$902,484 CJ est. value
Phoenix, AZ 85004

Fairfield Inn / Scottsdale
New Construction, Infrastructure - 75,622 SF
Design
$33,000,000 CJ est. value
Scottsdale, AZ 85255

Central and Thomas High Rise
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Phoenix, AZ 85012

Lehi Loop Shared Use Pathway - Phase 1
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Mesa, AZ 85208

Lehi Loop Shared Use Pathway - Phase 1
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Mesa, AZ 85208

FY 2021 Cave Creek Road Microsurfacing
Results
Cave Creek, AZ

Old Town Avondale Phase II Improvements - CMAR
Infrastructure
Results
Avondale, AZ

Gateway Freeway (SR 24) (Ellsworth Road to Ironwood Drive)
New Construction, Infrastructure
Construction
$76,999,509 CJ est. value
Mesa, AZ 85212

Gateway Freeway (SR 24) (Ellsworth Road to Ironwood Drive)
New Construction, Infrastructure
Construction
$76,999,509 CJ est. value
Mesa, AZ 85212

Southern Avenue and Country Club Drive Intersection Improvements - City of Mesa
Infrastructure
Pending Verification
$27,148,555 CJ est. value
Mesa, AZ 85201

Southern Avenue and Country Club Drive Intersection Improvements - City of Mesa
Infrastructure
Pending Verification
$27,148,555 CJ est. value
Mesa, AZ 85201

Paradise Valley Community Center Repairs
Renovation
Conception
$1,000,000 est. value
Phoenix, AZ 85032

South Mountain Community Center Repairs
Renovation
Design
$1,000,000 est. value
Phoenix, AZ 85042

Site 20 New Reservoir Construction - Town of Gilbert
Infrastructure
Post-Bid
$13,700,000 CJ est. value
Gilbert, AZ 85297

Last Updated 04/28/2023 12:11 PM
Project Title

RFP Design - Architectural and Construction Administration Services for Thunderbird Conservation Park Improvements

Physical Address View project details and contacts
City, State (County) Glendale, AZ 85310   (Maricopa County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Maintenance, Misc. Recreational, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $11,629,053 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Glendale is seeking a qualified professional firm to provide design, preliminary cost estimating, permit approvals, and construction administration services to modernize the trailheads and associated facilities at the City of Glendale Thunderbird Conservation Park. The Thunderbird Conservation Park is 1,185 acres, located in the Hedgpeth Hills in north Glendale, Arizona. The park is dedicated to preserving the desert environment and offers activities that include picnicking, hiking, horseback riding, mountain biking, jogging, and bird watching. The park includes approximately 15-miles of multiuse trails, parking lots, ramadas, and restrooms. There are three trailheads/entrances to the park. The main trail/headentrance is off of 59th Avenue (22600 North 59th Avenue), another on Pinnacle Peak Road at 55th Avenue (5486 W. Pinnacle Peak Road), and the third off of 67th Avenue at Patrick Lane. The trails and access roads branch from these trailheads into the park. The City Parks and Recreation Master Plan was updated this year, 2021. Goals and objectives considered for this project include: improve access to the park by prioritizing improvements to the trailheads and infrastructure, develop an environmental education program, revegetate native desert areas, revitalize the existing amphitheater into a desert botanical garden, update or replace existing facilities (e.g., restrooms, shade structures, trailheads, etc.), provide trail, historic, and environmental interpretive signs, and fund a trail maintenance program. Questions pertaining to the RFP or selection process should be directed in writing to the Engineering Department, City of Glendale, 5850 West Glendale Avenue, Glendale, AZ 85301, or by email to EngineeringDept@glendaleaz.com. The current budget for this project is approximately $5M The Method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents