Similar Projects
2019 Slurry Seal
Results
Less than $990,000 est. value

2019 Surface Treatment
Results
Less than $458,000 est. value

2019 Latex Modified
Results
Less than $2,191,000 est. value

On-Call Interstate Asphalt Concrete Patching
Results
Less than $847,000 est. value

High Friction Surface Treatment Paving
Results
Less than $925,000 est. value

2019 Plant Mix
Results
Less than $7,250,000 est. value
VA

Pavement Marking Eradication, Grooving
Term Contract
Results

2019 Plant Mix
Results
Less than $5,201,000 est. value
VA

2019 Plant Mix
Results
VA

Roadway Departure Crash Mitigation
Results
Less than $439,000 est. value
VA

Asphalt Paving Goods and Services
Term Contract
Results
Woodbridge, VA

Prince William Parkway Interchange at Realigned Balls Ford Road
Results
$145,000,000 est. value
Prince William, VA 22192

Inn Street Improvement Project
Results
Prince William, VA 22192

Occoquan Bay National Wildlife Refuge - FW-OCBA T302(1)
Results
$500,000 to $1,000,000 est. value
Prince William, VA

2020 Slurry Seal
Results
Less than $1,207,000 est. value

Last Updated 10/08/2019 11:47 AM
Project Title

Y--P588 Fuller Road Improvements, MCB, Quantico, VA

Physical Address View project details and contacts
City, State (County) Quantico, VA   (Prince William County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $15,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The work includes the reconstruction, widening and minor realignment of existing Fuller Road from each of U.S. Route 1 to Mason Drive, and new entry control facility (ECF)/access control point (ACP) with entrance security building(s). The security facilities include new gate house, two sentry houses, inspection shelters, a canopy structure, and personnel weather shelters. The work includes: forest clearing, demolition and removals, grading, retaining walls, utility relocations, site utilities (storm drain, sanitary sewer, telecom, and power), building structures, vehicle inspection canopy, active vehicle barrier, and incidental related work. The work includes, phased construction, maintenance of traffic, and maintenance of the existing SCP-ECF facility until the new facility is operational.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents