Similar Projects
2021 Construction Projects
Infrastructure
Post-Bid
Joliet, IL

2021 Construction Projects
Infrastructure
Post-Bid
Joliet, IL

Stony Island Avenue Pavement
Infrastructure
Results
IL

Resurfacing With Hot-Mix Asphalt Binder and Surface Courses
Infrastructure
Results
$179,076 est. value
Lockport, IL 60441

Bridge Point Romeoville
New Construction, Infrastructure - 660,280 SF
Pending Verification
$70,000,000 CJ est. value
Romeoville, IL 60446

Bridge Point Romeoville
New Construction, Infrastructure - 660,280 SF
Pending Verification
$70,000,000 CJ est. value
Romeoville, IL 60446

Holiday Inn Express & Suites / Peotone - Rebid
New Construction, Infrastructure - 45,000 SF
Post-Bid
$13,600,000 CJ est. value
Peotone, IL 60468

RR-21-4583R Weigh-In-Motion Replacement
Infrastructure
Results
Homer Glen, IL 60491

Parking Lot Replacement
Infrastructure
Post-Bid
Mokena, IL 60448

Annual Asphalt Repair and Replacement
Infrastructure
Results
Channahon, Naperville, IL 60564

Trucking, Traffic Control, Electrical, Concrete and Asphalt Paving
Infrastructure, Alteration
Post-Bid
Joliet, IL

All Abilities Trail Improvement
Infrastructure
Results
Channahon, IL 60410

House of Harvest
New Construction, Infrastructure - 3,500 SF
Post-Bid
$934,500 CJ est. value
Plainfield, IL 60544

Messenger Marsh Asphalt Trail Reconstruction
Infrastructure
Results
Homer Glen, IL 60491

2022 Road Program - Heggs Road
Infrastructure
Post-Bid
Plainfield, IL 60585

Last Updated 04/28/2023 05:15 PM
Project Title

2023 Parking Lot Reconstruction Projects

Physical Address View project details and contacts
City, State (County) Lockport, IL 60441   (Will County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $6,088,000 [brand] Estimate
Plans Available from Copy Center - 01/19/23
Owner View project details and contacts
Architect View project details and contacts
Description

Bids are invited from qualified Contractors for the 2023 Parking Lot Reconstruction project at Will County School District 92 schools. The Work shall take place at Walsh and Reed-Elementary Schools. The work includes, but is not limited to, the following: replacing and expanding bituminous pavement parking lots, site utilities, concrete sidewalks and curbs, site lighting, and septic system replacement. Refer to the Project Manual Specifications and Drawings for the full extent of the Work that will be required. A Bid Security of 10% of the Base Bid is required with the proposal. Contractors shall guarantee their submitted Bid Proposal for a ninety (90) day period from the date of Bid Opening. The Contractor must pay the Prevailing Wage Rates for all work per Illinois Law. The Owner reserves the right to reject any or all bids, to waive irregularities in the bidding procedure, or accept the Bid that, in its opinion, will serve the best interest of the School District. Any such decision shall be considered final. The Owner reserves the right to set aside a Bid from a Contractor who, in the Owner's opinion, does not exhibit past experience equal to the size and scope of this project. For general project information please contact: Peter Pontarelli, DLA Architects, Ltd., 847-742-4063, p.pontarelli@dla-ltd.com. For questions regarding the electronic bid submission process, please contact BHFX at 847-593-3161 x. 206.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents