Similar Projects
CDBG-I Sewer Rehabilitation/Replacement Project
Infrastructure
Bidding
Kenly, NC 27542

385 West Transmission Improvements
Post-Bid
$600,000 est. value
Clayton, Smithfield, NC 27520

East River - Phase 3, 4, and 5
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Smithfield, NC

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

2017 Water and Sewer System Improvements
Results
Pine Level, NC 27568

Ductile Iron Pipe
Infrastructure
Post-Bid
Clayton, NC 27520

Mcgee`s Crossroads Sewer Upgrade - Phase 1 and 2A
Results
Less than $5,350,000 est. value
NC 27577

Construction of Nc 96 / Keen Road Sewer Extension
Infrastructure
Post-Bid
Four Oaks, NC 27524

Mcgee`s Crossroads Sewer Upgrade Phase 2B - Middle Creek Interceptor
Results
Less than $2,700,000 est. value
NC 27577

Ingrams Township Water District 2018-19 Hydraulic Improvements
Infrastructure
Post-Bid
Smithfield, NC

New Thanksgiving Elementary School Sanitary Sewer Force Main
Results
Smithfield, NC 27577

Golden Leaf Foundation Sewer Rehabilitation Project
Results
Selma, NC 27576

New Thanksgiving School Force Main Project
Results
NC

Buffalo WWPS Upgrade and Force Main Project
Results
Smithfield, NC 27577

Replace Fire Hydrants on Fire Training Grounds
Results
Less than $16,950 est. value
Smithfield, NC 27577

Last Updated 11/23/2021 02:17 PM
Project Title

Little Creek Wastewater Transmission Linework Improvements Project

Physical Address View project details and contacts
City, State (County) Clayton, NC   (Johnston County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $13,370,040
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract 1: The project consists of approximately 5,060 LF of new 24 inch force main from the existing Little Creek WRF to the gravity discharge on Front St. The project includes bore and jacks under US70, Main Street and NCRR. The force main will cross one stream. The project consists of approximately 12,390 LF of new 24, 36, 42 and 48 inch gravity sewer from the top of Front St. to the future influent pump station. Additional 30 and 36 inch gravity sewer is included at the future influent pump station to divert flows. The gravity sewer will cross multiple streams.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents