Similar Projects
HVAC Plasma Filtration Units for Air Handlers
Bidding
Austin, TX

Installation & Upgrade Of Controls/Automation Systems
Alteration
Bidding
Austin, TX

Mold Removal and Remediation at Austin State Supported Living Center
Demolition
Post-Bid
Less than $382,328 est. value
Austin, TX 78756

HVAC Upgrade, Flight Services
Post-Bid
Less than $293,000 est. value
Austin, TX 78744

MEDEX Sobriety Center Chiller Upgrade
Results
Less than $235,000 est. value
Austin, TX 78701

Bauer Compressor Maintenance
Results
Less than $5,000 est. value
Austin, TX 78767

HVAC Maintenance and Repair
Alteration
Bidding
Austin, TX

CCRC Walk-in Cooler/Freezer
Post-Bid
Austin, TX 78756

HVAC Upgrades and Replacements
Results
Pflugerville, TX 78660

Heavy Duty Portable Air Condition
Alteration
Bidding
Austin, TX

Merv13 Filters
Post-Bid
Austin, TX 73301

HVAC Equipment, Supplies and Installation
Results
Austin, TX 78759

Dust Collection System
Post-Bid
Austin, TX 78703

HVAC and Generator Replacement at the Austin State Supported Living Center
Results
$157,000 est. value
Austin, TX 78703

7.5 Ton HVAC Unit
Post-Bid
Austin, TX 78767

Last Updated 08/13/2021 12:06 PM
Project Title

Handcox Water Treatment Plant Process Building HVAC Improvement Project

Physical Address View project details and contacts
City, State (County) Austin, TX   (Travis County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $539,289
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

HVAC will be added to the sodium hypochlorite (SH) building. A salt dust collection system will be added to the SH brine tank salt offloading. HVAC will be added to the filter building backwash blower room. Ventilation will be increased for the chemical building fluoride room. The absence of HVAC for the three (3) process buildings creates an operational difficulty due to overheating equipment. The salt dust created by salt offloading is drawn onto the equipment and creates a corrosive environment. The fluoride room requires additional ventilation for personnel safety.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents