Similar Projects
Cedarwood Elementary School Classroom Wing Addition
Addition
Conception
$13,900,000 est. value
Clovis, CA 93611

Pilibos Improvements - PC00185 - City of Fresno
Infrastructure
Conception
$910,200 CJ est. value
Fresno, CA 93727

Lakeshore Stewardship IRSC
Infrastructure
Design
$150,000 CJ est. value
Prather, CA 93651

Divine Mercy Catholic Church
New Construction, Infrastructure - 49,100 SF
Design
$16,000,000 CJ est. value
Clovis, CA 93619

Remove Asphalt Pavement, Replace With HMA, & Replace Drainage System
Infrastructure
Bidding
$15,500,000 CJ est. value
Elm View, CA 93725

Expand Medical Center Parking Area
Infrastructure
Bidding
$10,000,000 CJ est. value
Clovis, CA 93611

Bridge Preventive Maintenance Program Deck Treatments
Infrastructure
Post-Bid
$376,000 CJ est. value
Fresno, CA 93721

RFP D/B - Ambassador Temporary Housing
Renovation - 25,134 SF
Post-Bid
$4,000,000 CJ est. value
Fresno, CA 93728

American Avenue Disposal Site Phase One Waste Relocation
Infrastructure
Results
$23,700,000 to $26,200,000 est. value
Kerman, CA 93630

Monte Vista Terrace Demolition and New Office
New Construction, Demolition
Results
Fresno, CA 93701

The Arthur at Blackstone
New Construction, Infrastructure - 14,000 SF
Construction
$24,000,000 CJ est. value
Fresno, CA 93703

The Arthur at Blackstone
New Construction, Infrastructure - 14,000 SF
Construction
$24,000,000 CJ est. value
Fresno, CA 93703

7-Eleven #1042810 / Fresno
New Construction, Infrastructure - 3,131 SF
Pending Verification
$850,000 CJ est. value
Fresno, CA 93702

Parc West - Phase I
New Construction, Infrastructure
Pending Verification
$35,500,000 CJ est. value
Fresno, CA 93723

South Tower Park - PC00204 - City of Fresno
Infrastructure
Conception
$2,071,000 CJ est. value
Fresno, CA 93721

Last Updated 12/05/2022 03:17 PM
Project Title

Lease-Leaseback A. L. Conner Elementary School - New Administration Building

Physical Address View project details and contacts
City, State (County) Orange Cove, CA 93646   (Fresno County)
Category(s) Commercial, Education, Heavy and Highway
Sub-Category(s) Elementary School, Office, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of Project is defined by the Contract Documents and consists of the following: Project consists of one new 2500 SF one story administration building and associated sitework as described in the construction documents. The sitework shall include, but is not limited to; the provisions of concrete walks, fire alarm, landscaping and irrigation. Contractor shall connect all electrical, fire alarm, data connections, irrigation, water, and sewer as required for complete and operational systems. As of December 5, 2022, an architect and a general contractor have been selected. Construction is expected to begin in January of 2023. Type of Contract: Project will be constructed under a Lease-Leaseback A. The Work shall be completed according to the Project schedule set forth below. B. Occupancy: The Project may be occupied by District staff as shown below. If so, the premises will be occupied whether or not the Work is completed, regardless of time extensions (if any). C. Any Work performed after this date will need to be fully coordinated with District and will be limited to after school hours or on weekends. The Owner reserves the right to let separate contract for work outside of the scope of this Contract. Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying Work under this Contract or other contracts. Coordinate the Work of this Contract with work performed under separate contracts The Owner has a critical need for the Work to begin upon Notice to Proceed and shall be Substantially Complete by the date specified on the Project Schedule. There will be No Extensions of Time due to weather *This project has been awarded and all trades have been let.

Details

1 Story Above Grade, 2,500 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents