Similar Projects
Air Conditioning and Quality Improvements Package 1 - 2022 Bond - Lansing School District
Alteration
Design
$4,100,000 est. value
Lansing, MI

Air Conditioning and Quality Improvements Package 5 - 2022 Bond - Lansing School
Alteration
Design
$4,100,000 est. value
Lansing, MI 48933

Haslett High School - Natatorium HVAC Modifications
Renovation
Sub-Bidding
$80,000 CJ est. value
Meridian charter Township, MI 48840

East Lansing Public Library HVAC Upgrade and Site Improvements
Post-Bid
East Lansing, MI 48823

HVAC and Mechanical Products
Term Contract
Post-Bid

Beekman Center Condensing Unit Upgrade
Results
Lansing, MI 48910

Jan-Records Building-Replace North Ahus (1-4)
Results
Lansing, MI

Owen Graduate Hall - Implement Energy Conservation Measures
Post-Bid
East Lansing, MI

Bipolar Ionization System Installation
Results
East Lansing, MI

Connection To Chemistry To Retire Chillers 1 & 2
Post-Bid
Mason, MI

Abate and Pressurize Stairwells and Lobby Heating
Results
Lansing, MI 48933

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Replace HVAC System - Lottery Building
Results
Lansing, MI 48933

RTU Replacements
Alteration
Post-Bid
Lansing, MI 48910

HVAC Controls Systems
Alteration
Results
Lansing, MI

Last Updated 08/30/2022 10:35 AM
Project Title

Steam and Condensate Replacement for Geagley Laboratory

Physical Address View project details and contacts
City, State (County) East Lansing, MI 48823   (Ingham County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,846,900 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project will be two phases to replace the steam heating system in the Geagley laboratory. The first phase will be to replace the existing steam coils with new hydronic coils along with new hot water heating boilers to provide tempered air to the system. The second phase will to be remove and replace the existing steam boilers with hot water boilers and a new water heater to provide for the VAV and domestic system. ACCEPTING QUESTIONS UNTIL: July 27th 2022 at 2:00pm 5% Bid Security

Details

3 Stories Above Grade, 60,450 SF.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents