Similar Projects
Railroad Avenue – CDBG 2016 – Water and Sewer System Improvements
Post-Bid
Cochran, GA

Magnolia Drainage Improvements
Post-Bid
Less than $275,000 est. value
Tifton, GA

Parking Lot Resurfacing Repair of the Welcome Center Parking Lot
Results
Lincolnton, GA 30817

Tradeport East Rough Grading and Drainage Improvements
Results
Less than $563,843 est. value
GA

Amazon Parking Lot Expansion
Construction
Smyrna, GA

Downtown Streetscape and Utility Improvements, Phase II
Post-Bid
Gainesville, GA 30501

Mobley Park Storm Drainage Improvements
Results
Port Wentworth, GA

Parking Lot and Trailhead
Post-Bid
Sandersville, GA

GC Services for Peachtree MS Site Access Improvements
Results
Less than $1,000,000 est. value
Atlanta, Dunwoody, GA 30338

Cedar Walk Apartments
Post-Bid
Hinesville, GA 31313

Kennesaw Avenue Sidewalk and Drainage Improvements
Results
$350,000 to $500,000 est. value
Nelson, GA

Storm Drainage Improvements FY2018 CDBG
Post-Bid
Irwinton, GA 31042

2019 Parking Lot Rehabilitation
Results
Clarkesville, GA 30523

Replacement of the Streets and Drainage Improvements
Post-Bid
Jesup, GA 31545

Exit 18 Erosion Control and Welcome Sign Installation
Results
La Grange, GA 30240

Last Updated 01/30/2020 10:18 AM
Project Title

Recreation Department Improvements

Physical Address View project details and contacts
City, State (County) Millen, GA   (Jenkins County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: Drainage and parking improvements including, but not limited to, 6,820 SY of GAB, 336 GAL of bituminous tack coat, 797 tons of 12.5 MM Superpave, 860 LF of 15” HPPP, 196 LF of 18” HPPP, 9 grate inlets, 141 SY of 4” sidewalk, and erosion control.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents