Similar Projects
Residential Home Repair - composition Roof Replacement
Renovation
Sub-Bidding
$50,000 CJ est. value
Tacoma, WA 98405

Weatherization - Residential Composition Roof Replacement
Renovation
Sub-Bidding
$60,000 CJ est. value
Tacoma, WA 98402

MHR Residential Composition and Membrane Roof West
Alteration
Post-Bid
$10,000 est. value
WA

MHR Residential Composition Roof
Alteration
Post-Bid
Midland, Sumner, Tacoma, WA 98444

MHR Residential Roofing
Alteration
Results
Spanaway, Tacoma, WA

Weatherization Residential Insulation 8560
Alteration
Results
WA

Rainier School Laundry Building Roof Recover
Renovation
Sub-Bidding
$672,000 CJ est. value
Buckley, WA 98321

MHR - Roof Coating
Alteration
Post-Bid
$1,500 est. value
Lakebay, WA 98349

Weatherization Residential Insulation 8554
Alteration
Results
WA

MHR - Residential Torch Down Roof
Alteration
Post-Bid
$11,000 est. value
Tacoma, WA 98444

Weatherization Residential Insulation 8580
Alteration
Results
WA

Frontier Park Horse Arena Cover
Alteration
Post-Bid
$1,600,000 est. value
WA

Weatherization Residential Insulation 8549
Alteration
Results
WA

MHR Residential Composition Roof
Alteration
Post-Bid
$30,100 est. value
Spanaway, WA

Weatherization Residential Insulation 8546
Alteration
Results
WA

Last Updated 02/08/2023 06:05 PM
Project Title

WSH -Building. 29: Roofing Replacement

Physical Address View project details and contacts
City, State (County) Lakewood, WA 98498   (Pierce County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,696,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

WSH -Building. 29: Roofing Replacement Form A (HVAC, Plumbing, and Electrical) with its bid proposal or within one hour after the bid submittal time/date. Form B (Structural Steel Install, Rebar Install) within 48 hours after the bid submittal time/date. Forms A and B must be emailed to: FPSsubcontractorlist@des.wa.gov For specific directions for an on-site pre-bid meeting or site visit, please contact the Consultant listed below. FPS will be accepting mailed-in or hand-delivered bids. Clearly identify that it is a SEALED BID on the outside of the envelope. Include an attention line in the address to ensure that the bid is routed correctly. For hand-delivering bids, a locked drop box will be available in the 1500 Jefferson St. S.E. building lobby for contractors to deposit their sealed bids. An FPS staff member will be inside the lobby monitoring the locked drop box during those hours. Additionally, all Public Works Bid Openings will be conducted via live stream on YouTube. A link to the live stream for bid opening can be found above. Contractors and the public will not be allowed to stay to watch the bid opening in person. We will strive to begin bid opening live streams within thirty minutes of the bid closing and appreciate your patience as we deploy this new process. If you have questions, please contact us at EASMail@des.wa.gov or call (360) 902-7272 (voice message only). Please direct questions regarding this project to the office of the Consultant, KMB architects, Attn: Adam Herrick, 906 Columbia Street SW, Suite 400, Olympia, WA 98501, e-mail adamherrick@kmb-architects.com, telephone (360) 292-1209. Within 72 hours following the bid opening, results will be available on the FPS web site at https://apps.des.wa.gov/EASbids/BidResult.aspx. The State of Washington prevailing wage rates are applicable for this public works project located in Pierce County. Bidders are responsible to verify and use the most recent prevailing wage rates. The "Effective Date" for this project is the Bid Form due date above. The applicable prevailing wage rates may be found on the Department of Labor & Industries website located at https://secure.lni.wa.gov/wagelookup/ Mandatory 15% apprentice labor hours of the total labor hours are a requirement of the construction contract. Voluntary workforce diversity goals for this apprentice participation are identified in the Instructions to Bidders and the General Conditions for Washington State Facility Construction. Bidders may contact the Department of Labor & Industries, Apprenticeship Section, to obtain information on available apprenticeship programs. In accordance with RCW 39.30.060, if the base bid and the sum of the additive alternates is one million dollars or more, the Bidder is required to provide the names of the Subcontractors with whom the Bidder will directly subcontract for the performance of heating, ventilation and air conditioning (HVAC), plumbing and electrical for this project on Subcontractor List Form A within one hour of the bid submittal time via email to FPSsubcontractorlist@des.wa.gov. The Bidder shall also provide names of the Subcontractors with whom the Bidder will subcontract for structural steel installation and rebar installation on Subcontractor List Form B within 48 hours of the bid submittal time via email to FPSsubcontractorlist@des.wa.gov. Supplemental Bidder Responsibility will be evaluated for this project. In determining Bidder responsibility, the Owner shall consider an overall accounting of the criteria set forth in "DIVISION 00 SUPPLEMENTAL RESPONSIBILITY CRITERIA". Please direct questions regarding this subject to the office of the Consultant. The successful Bidder is required to register and create an account in the DES Diversity Compliance program (B2Gnow). Voluntary numerical Diverse Business goals of 12% MBE, 8% WBE, 5% Washington Small Business, and 5% Veterans have been established for this project. Achievement of the goals is encouraged. ESTIMATED BID COST RANGE: $2,863,200 to $3,164,500 The State reserves the right to accept or reject any or all bids and to waive informalities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents