Similar Projects
Kewaskum School Cooler Expansion
Infrastructure, Alteration
Bidding
$100,000 est. value
Kewaskum, WI 53040

Harrison Street Reconstruction
Infrastructure
Bidding
$620,000 est. value
Hartford, WI

Forest Avenue Reconstruction
Post-Bid
West Bend, WI

Road Improvement
Post-Bid
West Bend, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

County Trunk Highway W Reconstruction STH 175 - STH 33
Results
West Bend, WI

Crack Filling
Post-Bid
WI

Goldendale Road Reconstruction
Results
$175,000 to $275,000 est. value
Germantown, WI 53022

Hot Mix Asphaltic Paving
Post-Bid
WI

2021 Seal Coat Program
Results
$80,000 to $100,000 est. value
Hartford, WI

Cold Mix Asphaltic Paving
Post-Bid
WI

2021 Asphalt Overlay Program
Results
$400,000 est. value
Hartford, WI

Coated Chip Seal
Post-Bid
WI

2021 East Lincoln Avenue Reconstruction
Results
$950,000 est. value
Hartford, WI 53027

Slurry Seal
Post-Bid
WI

Reported 04/19/2022 12:00 AM
Project Title

Town Road Maintenance for the 2022 Season

Physical Address View project details and contacts
City, State (County) Richfield, WI   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $160,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Grading of Town Roads. Approximately 15 miles of road, Bid must be per hour using the BIDDERS EQUIPMENT. The number of times to be determined by the Board. 2) Mowing of Town Roads. Approximately 42 miles roads, Bid must be per hour using the BIDDERS EQUIPMENT, and/ or per hour using the Town Mower. The number of times to be determined by the Board 3) Gravel Hauling. o Cypress Ave- 4th Ave to Town line , approximately 3 miles select low areas o Cottonville Ave (Rustic Road ) from 4th West to Town line approximately 3 miles select low areas 4) Double Seal Over Hard Surfaces o Chicago Ave - Marked area, (can see fresh seal from 2019) East - approximately 1 1/2 mile o 1st Drive G to CC, approximately 1 mile o Cumberland approximately 1 Ave - 3rd to G approximately 1 mile o Cypress Ave - 1st Drive to G -approximately 1 mile

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents