Similar Projects
Park Center Senior High Locker Room Renovations
Build-out, Renovation
Bidding
$200,000 CJ est. value
Minneapolis, MN 55443

SLP Public Schools Maintenance Building & Data Center
New Construction, Renovation, Infrastructure - 25,443 SF
Sub-Bidding
$5,000,000 CJ est. value
St Louis Park, MN 55426

Anthony Safe and Welcoming Entry and Miscellaneous Upgrades
Renovation, Alteration
Post-Bid
Minneapolis, MN 55419

Saint Louis Park MS Classroom
Renovation
Post-Bid
Minneapolis, MN 55426

Media Center - Group 2
Renovation
Results
Blaine, Champlin, MN 55434

FY22 Washburn High School SPED Toilet 112A Renovation
Renovation
Results
$500,000 est. value
Minneapolis, MN 55419

Minnetonka High School - New Vantage / Momentum Building
New Construction, Infrastructure - 36,300 SF
Construction
$15,555,083 CJ est. value
Minnetonka, MN 55345

Wayzata EMS/CMS 2022 Mechanical Upgrades
Renovation, Alteration
Post-Bid
Medina, Plymouth, Wayzata, MN

Oak Grove Middle School, Technology Office Renovation
Renovation
Results
$256,400 CJ est. value
Bloomington, MN 55431

High School Stadium Improvements
Renovation
Post-Bid
$1,500,000 est. value
Eden Prairie, MN 55346

Edina High School 2023 Mechanical Renovations
Renovation
Results
$10,752,019 CJ est. value
Edina, MN 55439

Sullivan Middle School Tech Space Renovation
Renovation
Post-Bid
$190,000 est. value
Minneapolis, MN 55408

Multi-Site SPED Toilet Renovations
Renovation
Results
$372,310 CJ est. value
Minneapolis, MN 55415

Phase 1 North High School CTE Renovations
Renovation
Post-Bid
$380,000 CJ est. value
Minneapolis, MN 55411

St Louis Park High School Classroom Renovations
Build-out, Renovation
Results
$1,061,229 CJ est. value
St Louis Park, MN 55426

Last Updated 07/07/2023 01:07 PM
Project Title

Hopkins High School 2023 Ventilation Improvements

Physical Address View project details and contacts
City, State (County) Hopkins, MN 55305   (Hennepin County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Bids by Invitation
Project Status Construction Nearing Completion, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 7, 2023, the project has been awarded, construction is underway and nearing completion, however, information regarding the awarded contractor has not been confirmed at this time. Ventilation improvements and other related architectural interior remodel work.* *The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder.

Details

3 Stories Above Grade, 57,096 SF.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents