Reported | 09/09/2021 12:00 AM |
Project Title | Design and Construction Services Durham Fire and EMS Station 19 |
Physical Address | View project details and contacts |
City, State (County) | Durham, NC (Durham County) |
Category(s) | Professional Services |
Sub-Category(s) | Architectural, Engineering |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | $7,000,000 |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Design-Builder’s scope of work will include, but is not limited to: 1. Pre-Planning, schedule and budget review. Review of the prototype and site plan validation. Pre-construction project planning including preliminary cost estimate. 2. Preparing site, architectural, structural, mechanical, plumbing and electrical design plans based on Owner’s criteria and prototype information to include: a. Site Design: clearing and grubbing, grading and drainage plans, sedimentation and erosion control plans, layout and staking plans, elevations and sections, construction details, lighting and signage, landscape and planting plans and details, geotechnical investigations to support site and building design; b. Building Design: building plan configuration and elevation elements including exterior building skin materials and colors, foundation, structural and roof systems, building fenestration and openings, overall dimensions, materials testing requirements, Mechanical/Electrical/Plumbing design including systems, equipment and calculations, energy and performance modeling, design and installation of a roof-mounted photo-voltaic solar generating system, systems review, coordination and integration to include all utilities and controls, assess and coordinate LEED certification items and submittals (LEED Gold is desired); 3. Development and refinement of cost estimates and project schedules; 4. Construction administration and observation including conferences, weekly site observations and regularly scheduled progress meetings with the City and County; 5. Project closeout, establishment of warranties, guarantees and LEED certification. Final start-up and certification of mechanical, electrical and plumbing systems. The goals are 8% M/UBE and 6% W/UBE for the RFQ submission. |
Details | Architectural, New Construction. |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |