Similar Projects
Water Tank Recoating 2019
Post-Bid
Less than $150,000 est. value
Jacksonville, OH

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

0.5 MG Elevated Water Storage Tank
Results
$1,590,000 est. value
Tipp City, OH

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Contract I: Procurement of two hundred (200) Grinder Pump Cores, Controls and Appurtenances
Results
Hillsboro, OH 45133

H--Annual Water Tank Cleaning and Inspection | Base +4 OYs
Results
Chillicothe, OH

Supply and Installation of a 12,000 Gallon Horizontal, Doublewall Tank
Results
Circleville, OH 43113

Dogwood Reservoir Rehabilitation
Results
Less than $388,198 est. value
Dayton, OH 45390

Bowling Green WPC ATAD Tank Cover Replacement
Results
Less than $750,000 est. value
Bowling Green, OH 43402

Brooks Avenue Elevated Water Tank Improvements
Term Contract
Results
Less than $380,000 est. value
Van Wert, OH 45891

WRRF Sludge Tank
Results
Less than $1,800,000 est. value
Wooster, OH 44691

Compost - DEF Tank
Results
Columbus, OH

West Elkton Water Tower Replacement
Results
New Miami, OH 45011

Luckey Area Water Tower Aeration and Mixing Improvements Wl 183L (A)(1)
Results
Less than $100,000 est. value
Bowling Green, OH 43402

PS MH 10,000 Gallon Vertical Storage Tanks
Results
Columbus, OH

Last Updated 12/19/2019 03:37 PM
Project Title

Easterly Aeration Tanks Rehabilitation Project(Atr-4)(1540)

Physical Address View project details and contacts
City, State (County) Cleveland, OH 44115   (Cuyahoga County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $12,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For construction of the following work: Aeration tank work including new diffuser membranes, flushing systems, and drainage piping Installation of a new blower and associated work. Gate motor actuator replacements . NPW connections for odorcontrol.Installation of a pump in the main drainage conduit pump station .Concrete repair, installation of access platforms, pavement, grating, lighting, new security fencing, and access ladders .Instrumentation, controls, and electrical feed work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents