Similar Projects
Mobile Temporary 250 Ton Air Cooled Chiller at Barnstable United Elementary
Bidding
Marstons Mills, MA 02648

Replace Two Air Conditioning Condensers at 36 Harold Lane
Bidding
Less than $25,842 est. value
Chatham, MA 02633

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Replacement of Harrington Building AHUs
Post-Bid
Less than $148,500 est. value
Buzzards Bay, MA

HVAC Maintenance
Results
Buzzards Bay, MA 02542

Install Two Daikin Heat Pumps to Provide AC to Second Floor Offices, Second Floor Main Area and First Floor Front Desk
Results
Less than $19,500 est. value
Orleans, MA

Install Two Daikin Heat Pumps to Provide AC to Second Floor Offices, Second Floor Main Area and First Floor Front Desk - Sub Bids
Post-Bid
Orleans, MA

Heating System Renovations - Morse Pond and East Falmouth Schools - General Bid
Results
Less than $980,000 est. value
East Falmouth, MA 02536

HVAC Upgrades in the North and South (Maureen M. Wilkens Hall) Buildings - General Bid
Post-Bid
Less than $1,098,326 est. value
West Barnstable, MA 02668

2019 Barnstable West Barnstable HVAC Replacement Project
Results
West Barnstable, MA 02668

HVAC Upgrades in the North and South (Maureen M. Wilkens Hall) Buildings - Filed Sub Bids
Post-Bid
Less than $1,098,326 est. value
West Barnstable, MA

IDIQ JOC HVAC Phase 2
Results
Less than $500,000 est. value

Replace the Air Conditioning System at the Fire Station
Post-Bid
Eastham, MA

Installation of Air Conditioning Units - General Bids
Results
Less than $17,000 est. value
Orleans, MA

Provide Cooling Coils At Three AHUs
Post-Bid
$100,000 est. value
Buzzards Bay, MA 02532

Last Updated 08/15/2019 08:05 AM
Project Title

Furnish and Install Air Conditioning at the Falmouth Station

Physical Address View project details and contacts
City, State (County) Falmouth, MA 02540   (Barnstable County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Design and provide all the requested services associated with an air conditioning system for the station. The EDIC is relying on the selected AC firm to advise the EDIC on best practices, design and energy efficiency for the ultimate units selected and installed. The scope of work is envisioned to possibly include two (2) energy efficient ductless mini-split air-conditioning units into the Falmouth Station (final locations to be determined but appears one at each end of the station would be best locations). There is no AC planned for the any other spaces in the Station. The Falmouth Station floorplan design is shown on Attachment #1. Venting and equipment is preferred to be installed through the ceiling and onto the Falmouth Station roof. The architectural roof plan is shown on Attachment #2. The SOW will include but is not limited to: 1. Design of an energy efficient, ductless, mini-split air-conditioning system that best suits the space for the effective cooling of the Falmouth Station. 2. Installation of the compression and delivery units. 3. Installation of all coolant supply and drainage pipes. 4. All electrical work necessary to complete the project. 5. If necessary, the repair of installation damages to the interior/exterior walls, ceiling, roof, etc., to their original pre-construction condition.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents