Similar Projects
Campus Plaza & Fountain Project Phase I
Bidding
$1,500,000 to $2,200,000 est. value
West Chester, PA

Lousiana Avenue Stormwater Improvements - Phase 2
Bidding
Dormont, PA 15216

Lower Yoder Sanitary/Storm Sewer Separation Project Phase III
Post-Bid
Johnstown, PA 15901

Cast Iron Frames and Grates
Post-Bid
Greensburg, PA 15601

Twin Oaks Storm Sewer Piping Project
Results
Gettysburg, PA

2019 Blairsville Highway Turn Back Project Old Main Street and South Liberty Street
Results
Blairsville, PA

Whitebirch Road Extension
New Construction
Construction
Hazle Township, PA 18201

Linden Street Stormwater Improvement Project
Bidding
Clarks Summit, PA 18411

Storm Structures for Rain Garden
Post-Bid
Allentown, PA

Brookwood/Park Terrace Stormwater Bmp Project
Results
Paxtang, PA

Nobles Lane Storm System Improvements
Bidding
Pittsburgh, PA 15210

Parkview Storm Sewer Replacement
Post-Bid
Bellwood, PA 16617

Repair the Storm Water Piping at North Allegheny Senior High School
Results
Wexford, PA

Moon Golf Club Storage Building - Site Work Construction
Bidding
Moon Township, PA 15108

Bayard Street Storm Sewer Separation Phase 3 and 4
Post-Bid
Elizabeth, PA 15037

Reported 02/16/2021 12:00 AM
Project Title

Regrading and Retrofitting of the Existing Blettner Stormwater Basin

Physical Address View project details and contacts
City, State (County) Hanover, PA   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of regrading and retrofitting of the existing Blettner Stormwater Basin. The main section of the basin shall be regraded to include vegetated swales to direct stormwater and promote infiltration. The basin shall also be regraded to include a forebay area and two submerged gravel wetlands. The existing outfalls into the basin and the associated endwalls shall also be refurbished and or replaced. The entire site shall be restored using native and pollinator species.

Details

Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents