Similar Projects
In-N-Out Burger
New Construction - 4,000 SF
Conception
$500,000 to $1,000,000 CJ est. value
Boise, ID

In-N-Out Burger
New Construction - 3,879 SF
Conception
$500,000 to $1,000,000 CJ est. value
Meridian, ID 83642

Popeyes Louisiana Kitchen
New Construction - 2,325 SF
Design
Meridian, ID 83646

Peak at Sawtooth Village
New Construction, Infrastructure - 4,846 SF
Design
$1,400,000 CJ est. value
Meridian, ID 83646

Boise River Café Remodel
Build-out
Bidding
$750,000 CJ est. value
Boise, ID 83725

Devil And Angel Restaurant Ti
New Construction - 1,454 SF
Post-Bid
Less than $500,000 CJ est. value
Meridian, ID 83642

McDonalds
New Construction - 4,268 SF
Post-Bid
$1,000,000 to $5,000,000 est. value
Star, ID 83669

Bodo Block Food Hall
Renovation - 100,000 SF
Construction
$10,000,000 to $20,000,000 est. value
Boise, ID 83702

Blaze Pizza
Renovation - 2,917 SF
Construction
$130,000 est. value
Boise, ID 83709

Downtown Boise Revamp Projectr
Renovation - 98,000 SF
Pending Verification
$180,000,000 est. value
Boise, ID 83702

In-N-Out Burger
Renovation - 3,885 SF
Pending Verification
Boise, ID 83704

3100 Cellars
New Construction - 8,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Boise, ID

Plantation Golf Course and Country Club
Renovation, Alteration
Design
$300,000 est. value
Boise, ID 83714

Chuck E Cheese #959
Renovation - 12,296 SF
Post-Bid
Boise, ID 83704

Cupbop
Renovation - 1,353 SF
Construction
$255,267 est. value
Meridian, ID 83646

Last Updated 11/15/2022 10:33 AM
Project Title

Ling and Louie's Asian Bar & Grill

Physical Address View project details and contacts
City, State (County) Boise, ID 83706   (Ada County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: remodeling of a 2,670 square foot restaurant. The project appeared before the Garden City Design Committee on May 2 for a pre-application design review. As of July 14, 2022, no formal hearing has been scheduled. An architect and general contractor have been selected. Although a firm timeline has yet to be announced, construction is estimated to begin mid 2022.

Details

2,670 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents