Similar Projects
James Road Subdivision
New Construction, Infrastructure
Design
$94,300,000 CJ est. value
Valdosta, GA 31601

Milling, Plant Mix Resurfacing and Shoulder Rehabilitation on SR 135
Infrastructure
Bidding
$2,000,000 CJ est. value
Lake Park, GA 31636

Grove Point Lift Station Access Road
Infrastructure
Bidding
$4,000,000 CJ est. value
Valdosta, GA 31601

Manhole Improvements
Infrastructure
Post-Bid
$70,000 CJ est. value
Valdosta, GA 31601

RFP Construction Manager at Risk - A New Athletic Complex for Valdosta High School
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Valdosta, GA 31602

Rebid New Clyattville Community Center
New Construction, Infrastructure
Results
$560,465 CJ est. value
Clyattville, GA 31601

An Addition to Board Office Lowndes Board of Education
New Construction, Infrastructure - 10,000 SF
Results
$2,871,216 CJ est. value
Valdosta, GA 31601

South Georgia Medical Center Campus Expansion
Addition, Demolition, Renovation, Infrastructure - 125,000 SF
Pending Verification
$125,000,000 CJ est. value
Valdosta, GA 31602

Forrest Street Extension Townhomes
New Construction, Infrastructure
Pending Verification
$15,800,000 CJ est. value
Valdosta, GA 31605

Briggston Road
Infrastructure
Bidding
$4,000 CJ est. value
Valdosta, GA 31601

McKey Park Pickleball Facility
New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
Valdosta, GA 31602

Taxiway A, E, and H Crack Seal, Rejuvenator and Re-marking
Infrastructure
Results
$114,225 CJ est. value
Valdosta, GA 31601

Rocky Hill Church Road - Grading, Drainage, Base and Paving
Infrastructure
Bidding
$3,300,000 CJ est. value
Hahira, GA 31632

Widening, Leveling and Resurfacing Improvements to J Frank Culpepper Road
Infrastructure
Post-Bid
$60,000 CJ est. value
Lake Park, GA 31636

Valhalla Drive Paving
Infrastructure
Results
$229,825 CJ est. value
Valdosta, GA 31601

Last Updated 09/06/2023 11:16 AM
Project Title

RFP Construction Manager at - risk - Jail Medical Expansion

Physical Address View project details and contacts
City, State (County) Valdosta, GA 31601   (Lowndes County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Prison/Jail, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2024 , Request For Proposals, Construction documents
Bids Due View project details and contacts
Estimated Value $7,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Lowndes County Board of Commissioners (the County) will receive sealed proposals from Construction Managers for A New Addition for the Lowndes County Jail. The project site is located at 120 Prison Farm Road Valdosta, Georgia 31601. The project will include construction of a two-level 60 cell housing pod. Offerors should propose to construct the project as an At-Risk Construction Manager for a guaranteed maximum price. An award will be made based on the following evaluation factors: Relevant Experience, At-risk Construction Management Experience, Governmental Entity Experience, Local Business Participation Plan, Qualifications of Key Personnel, Stability of Company, and Terms of Agreement. All costs related to the preparation, submittal, or presentations of the proposals hereby requested for this project are the sole responsibility of the respondent and will not be assumed in full or in part by the Lowndes County Board of Commissioners. Proposals shall be honored for 60 days after the time set for opening of the proposals. Offerors should obtain a Request for Proposals from Lowndes County by emailing Amy.woods@lowndescounty.com and request an electronic file of the RFP.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents