Similar Projects
Security Vestibules for Commodore Perry Schools (Mechanical Construction)
Bidding
Hadley, PA 16430

EHIP Water Heater Project
Post-Bid
PA

Terminal B/C Vestibules - Mechanical
Post-Bid
$500,000 to $1,000,000 est. value
Philadelphia, PA 19102

Boiler Repair
Results
$100,000 to $250,000 est. value
Washington, PA 15301

New Community Center - Mechanical Construction
Results
Hershey, PA 17033

Sand Spring Wastewater Treatment Plant Upgrades- General/Process Mechanical
Construction
Less than $3,000,000 est. value
Schnecksville, PA 18078

Pittsburgh Obama 6-12 Gym A/C and Lighting Upgrades Mechanical and Electrical Primes
Post-Bid
Pittsburgh, PA 15206

Installation Of Gas Burners And Feedwater System At The Upper Darby Municipal Building
Results
Upper Darby, PA 19082

Pittsburgh Weil Prek-5 Boiler Replacement Mechanical, Electrical and Asbestos Abatement Primes
Post-Bid
Pittsburgh, PA 15219

North Pumping Station Mechanical Upgrades
Results
Enola, PA

Replacement of Natural Gas Boiler
Post-Bid
Williamsport, PA 17701

Boiler Service Preventative Maintenance and Repair 2019/2020
Term Contract
Results
Lock Haven, Mill Hall, PA

Pavement and Grounds Facilities - Mechanical
Post-Bid
Philadelphia, PA

Repair and Preventative Maintenance of Eight Parking Garages - Mechanical
Results
Reading, PA 19602

FMF-13 Carbottom Furnace Repair
Post-Bid
Philadelphia, PA 19112

Reported 11/06/2019 12:00 AM
Project Title

Replace Boiler at Mary Slaughter Apartments

Physical Address View project details and contacts
City, State (County) Williamsport, PA 17701   (Lycoming County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and dispose of the existing boiler, piping, and appendages that are not to be reused. Existing pad is to be reused, but any modifications are the responsibility of the contractor. New boiler is to be vented out the back wall near the existing water heater vents. Piping of the new boilers is to follow the manufactures recommendations IE; primary and secondary headers etc. It is the responsibility of the contractor to remove, replace, or modify the existing piping to follow the manufactures recommendations. All new piping will be insulated with 1 inch preformed fiberglass insulation with manufactured plastic preformed fittings.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents