Similar Projects
Mount Saint Mary Campus Revitalization Phase II
Renovation
Conception
Newburgh, NY 12550

USA Nordic Training Center at Paul Smith`s College
New Construction
Conception
Paul Smiths, NY 12970

Multi-Day Training Programs Phase I
New Construction
Design
$3,000,000 to $5,000,000 est. value
Chittenango, NY 13037

Schine Student Center
Renovation - 55,000 SF
Design
Syracuse, NY 13204

Renovate Hewitt Hall at SUNY Oswego - Phase 1
Renovation
Bidding
$20,000,000 to $25,000,000 est. value
Oswego, NY 13126

Jefferson Community College - Green Campus Entryway Phase 2
Bidding
$33,750 to $1,156,031 est. value
Watertown, NY 13601

Baker Lab Roof Replacement
Renovation
Bidding by Invitation
$200,000 to $230,000 est. value
Ithaca, NY 14882

Renovate Houghton Hall - Math Fitout at SUNY Fredonia
Renovation
Sub-Bidding
$2,500,000 to $5,000,000 est. value
Fredonia, NY 14063

SUNY At Purchase Building #45 Dormitory Crossroads Rehab & Building Abatement Phase 7
Post-Bid
Purchase, NY 10577

Suny Purchase - Visual Arts Perception Lab Renovation
Renovation
Post-Bid
Purchase, NY 10577

Replace Roofs - Multiple Clinical Program Buildings
Renovation - 28,000 SF
Results
$1,300,000 est. value
Ithaca, NY 14853

Emergency Department Psych Renovations Community Campus
Renovation
Results
$300,000 to $700,000 est. value
Syracuse, NY

Skidmore College Center for Integrated Sciences
New Construction - 200,000 SF
Construction
$127,000,000 est. value
Saratoga Springs, NY 12866

Construct New Emergency Services Building at SUNY Oneonta
New Construction - 9,000 SF
Construction
$5,000,000 to $10,000,000 est. value
Oneonta, NY 13820

RIT E Philip Saunders College of Business Building
Addition
Pending Verification
$16,000,000 est. value
Rochester, NY 14623

Last Updated 03/05/2020 11:37 AM
Project Title

Suny Alfred Mackenzie Hall Phase 3 - Renovation and Hazardous Materials Abatement

Physical Address View project details and contacts
City, State (County) Alfred, NY 14802   (Allegany County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes the renovation of MacKenzie North, demolition of a portion of the wing and site improvements associated with both the renovations and demolition. Phase 3 will be renovated as a three-phase project renovating approximately 23,000 sf of building per phase while demolishing 4,800 sf of building. Exterior renovation will include roof replacement (standing seam and EPDM), limited window replacement, construction of new entrance vestibules and the recladding of concrete wall panels. Interior renovations will include reconstruction of existing bathrooms as well as reconstruction of public and support spaces. Student rooms shall receive all new finishes. Mechanical and plumbing systems will be reconstructed as required by reconfiguration and will include replacement of heating mains, ventilation systems and domestic hot water. A fire protection system will be installed throughout the entire building. All power, lighting, data, CATV and fire alarm systems shall be replaced. Hazardous material abatement and removal will include gypsum wall board, VAT, pipe insulation as ACM and caulk as ACM and/or PCB. Building Demolition to include pre-demolition hazardous material abatement and removal of gypsum wall board, VAT and pipe insulation as ACM and caulk as ACM and/or PCB. Demolition to include removal of existing load bearing CMU structure, pre-cast floor and roof planks, concrete slab on grade and concrete foundations. All mechanical, plumbing and electrical systems shall be removed in their entirety. Site demolition to include removal of concrete and asphalt paving, exterior stairs, retaining walls and landscaping. The site will be excavated and regraded to allow for site improvements which will include extension/installation of site utilities and storm water system as well as concrete walks and stairs, asphalt paving, granite curbs and retaining walls. Site work to include construction of a new asphalt driveway through the site requiring excavation and regrading.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents