Similar Projects
New Kitchen Range Hoods, Musketahquid Village 667-1 - General Bid
Alteration
Bidding
$221,900 est. value
Sudbury, MA 01776

Nashoba Valley Technical High School HVAC Controls Upgrade
Alteration
Bidding
$400,000 est. value
Westford, MA 01886

New Kitchen Range Hoods, Musketahquid Village 667-1 - Sub Bid
Alteration
Sub-Bidding
$221,900 est. value
Sudbury, MA 01776

Station 4 Air Conditioning Project
Post-Bid
Less than $125,000 est. value
Reading, MA 01867

HVAC Air System Rebalancing
Post-Bid
$150,000 est. value
Chelmsford, MA

J041--Inspect and Clean Ductwork Bedford Massachusetts VAMC
Results
Bedford, MA 01730

Scheduled and Emergency HVAC System Repairs and Improvements at Various Locations
Results
$127,050 est. value

Chilled Water Piping Insulation Replacement, Donahue Hall - General Bid
Alteration
Bidding
$650,000 est. value
Lowell, MA 01854

Barbieri Warehouse Rooftop Unit
Post-Bid
$300,000 est. value
Framingham, MA

Watertown Police Department Firing Range HVAC Upgrades - General Bids
Results
Less than $450,000 est. value
Watertown, MA

Air Vent Cleaning of Aviation Hangars
Post-Bid

Watertown Police Department Firing Range HVAC Upgrades - Filed Sub Bids
Results
$425,000 est. value
Watertown, MA 02472

HVAC and Mechanical Products
Term Contract
Post-Bid

Mercier Center HVAC Renovation
Results
Less than $58,500 est. value
Lowell, MA 01854

Chiller System Replacements at the Innovation Academy
Post-Bid
Tyngsborough, MA 01879

Last Updated 05/25/2022 01:44 AM
Project Title

Morse Library HVAC and Controls Upgrades - Sub Bid

Physical Address View project details and contacts
City, State (County) Natick, MA 01760   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: Replace the existing air-cooled chiller on the roof with a new air-to-water heat pump. Install new plate and frame heat exchanger in the basement mechanical room so that the new heat pump can interface with the existing hot water loop. Replace the existing building automation system, including controllers and network wiring, with a new system. Replace failed control end devices, such as valve and damper actuators. DCAMM Certificate Required.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents