Similar Projects
Structure Tops R and R North County Sugar Bear Trail
Infrastructure
Post-Bid
$876,892 est. value
Clearwater, FL

On Call General Civil and Large Pipeline Contractor Services
Post-Bid
Clearwater, FL

Jail Perimeter Road Modification into Ditch Behind F-Wing
Results
Less than $1,165,522 est. value
Clearwater, FL 33762

Utility Rehabilitation and Construction Services
Term Contract
Results
Tarpon Springs, FL 34688

W220 Boca Ciega Bay Stormwater Quality Improvement Project
Post-Bid
Redington Beach, FL 33708

Riverside Force Main Flow Restoration
Results
Less than $67,408 est. value
Tarpon Springs, FL

Undergrounding Utilities Along Gulf Boulevard - Phase II
Post-Bid
Indian Rocks Beach, FL 34635

Sanitary Sewer Cleaning and Video Inspection
Term Contract
Results
Largo, FL

2021 Seawall and Stormwater Imrpovements - Don Cesar Place Neighborhood
Infrastructure
Post-Bid
Saint Pete Beach, FL 33706

Golf Course Drainage Improvements
Results
Less than $155,000 est. value
Tarpon Springs, FL

2021 Seawall and Stormwater Improvements-Don Cesar Place Neighborhood
Infrastructure
Post-Bid
Saint Pete Beach, FL

Seabreeze Drive Sanitary Sewer Project
Results
Less than $1,987,654 est. value
Tarpon Springs, FL 34689

Sewer Line Repairs
Infrastructure
Post-Bid
FL

Sanitary Sewer Line Cleaning & Video Inspection
Results
Largo, FL

Replacement of Chemical Drain and Drain Lines
Infrastructure
Post-Bid
FL

Reported 06/23/2022 12:00 AM
Project Title

2023 Sewer Point Repair and Improvements Project

Physical Address View project details and contacts
City, State (County) Clearwater, FL   (Pinellas County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The intent of this bid is to obtain competitive prices and establish a multi-year contract for as-needed services for wastewater infrastructure improvements and repairs. The successful contractor will be required to enter a contract with the City of Clearwater and provide all labor, equipment, and materials for infrastructure improvements and repairs This Contract is divided into six Groups (Groups A-F). Contractors are permitted to Bid on individual OR multiple groups, assuming the prequalification requirements are met Pre-qualification Amount: $1 Million (Group A, Group B, Group D, Group E, Group F) $2 Million (Group C)

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents