Similar Projects
2023 Mill and Overlay- Rebid
Infrastructure
Bidding
$414,915 CJ est. value
Pine City, MN 55063

Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$800,000 CJ est. value
Red Rock Township, MN 55912

Public Works Service Center PreCast Concrete
Addition, Demolition, Build-out, Infrastructure
Sub-Bidding
$300,000 CJ est. value
Rochester, MN 55904

Olmsted County Public Safety Building
New Construction, Infrastructure
Sub-Bidding
$300,000 CJ est. value
Rochester, MN 55904

South Kawishiwi Pavilion Ramp Construction and Log Repair
Infrastructure, Renovation
Post-Bid
$100,000 CJ est. value
Ely, MN 55731

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

2022 Random Concrete Repairs
Infrastructure, Alteration
Results
Saint Louis Park, MN

Silver Ramp Corrective Work
Alteration
Results
$3,291,435 est. value
Minneapolis, MN

Concrete Season Supply
Term Contract
Post-Bid
Rochester, MN

Basketball Court Replacement
Infrastructure, Alteration
Results
Lakeville, MN

11th and Marquette Post-Tension Tendon Repair
Infrastructure
Post-Bid
Minneapolis, MN

Bituminous Projects
Infrastructure
Results
$5,370,611 CJ est. value
Detroit Lakes, MN 56501

Excelsior Commons Concessions Building
New Construction, Infrastructure, Alteration
Post-Bid
Minnetonka, MN

2022 Miscellaneous Concrete Repairs and Installations
Alteration
Results
$175,000 est. value
Columbia Heights, MN

RAC Site Prep
Infrastructure
Post-Bid
$425,000 CJ est. value
Hassan Township, MN 55374

Last Updated 07/19/2023 12:27 PM
Project Title

He Mni Can - Barn Bluff Regional Park Phase 2 Improvements REBID

Physical Address View project details and contacts
City, State (County) Red Wing, MN 55066   (Goodhue County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $503,974 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

In general, Work consists of the construction of trail and overlook improvements for the Park. Work will consist of the development of soft surface trails, construction and installation of fabricated metal fencing and overlook structure, pultruded fiberglass grating overlook and ramps, grading, concrete footings and grade beam, design-build of interpretive signage and mounting brackets, cut stone site features. Also included is the installation of drain tile pipe. Work also shall comprise of miscellaneous sediment control, site improvements, archaeological feature protection, removals, invasive species management, and site restoration.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents