Similar Projects
Headquarters Operations Building Renovations
Renovation
Conception
San Jose, CA 95118

Flood Protection - City of San Jose
Infrastructure
Conception
$7,986,000 est. value
San Jose, CA 95134

Costco - Westgate West / San Jose
Demolition, New Construction, Infrastructure - 166,058 SF
Design
$46,000,000 CJ est. value
San Jose, CA 95129

Costco - Westgate West / San Jose
Demolition, New Construction, Infrastructure - 166,058 SF
Design
$46,000,000 CJ est. value
San Jose, CA 95129

Fisher Basin Expansion Project
Infrastructure
Bidding
$1,450,000 CJ est. value
Morgan Hill, CA 95037

Fisher Basin Expansion Project
Infrastructure
Bidding
$1,450,000 CJ est. value
Morgan Hill, CA 95037

South Loop Project
Infrastructure
Post-Bid
Santa Clara, CA 95134

FMD Ronald M George Elevator Modernization
Renovation
Post-Bid
$3,349,000 est. value
Oakland, San Francisco, San Jose, Santa Rosa, CA 94102

General Engineering (A License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
Infrastructure, Alteration
Results
$5,000,000 est. value

General Building (B License) Construction, San Francisco, San Mateo, Santa Clara, and Alameda Counties
New Construction, Renovation
Results
$5,000,000 est. value

Forest Hill Elementary School Phase One
New Construction
Construction
$4,500,000 est. value
San Jose, CA 95130

Kifer Senior Housing
New Construction, Infrastructure
Construction
$13,500,000 CJ est. value
Santa Clara, CA 95051

Icon / Echo
Demolition, New Construction, Infrastructure - 525,000 SF
Pending Verification
$600,000,000 CJ est. value
San Jose, CA 95113

Icon / Echo
Demolition, New Construction, Infrastructure - 525,000 SF
Pending Verification
$600,000,000 CJ est. value
San Jose, CA 95113

Measure T - New Fire Station 36 - City of San Jose
New Construction, Infrastructure
Conception
$11,985,000 est. value
San Jose, CA

Last Updated 03/25/2023 01:34 PM
Project Title

Service Center Security Gate Project

Physical Address View project details and contacts
City, State (County) Cupertino, CA 95014   (Santa Clara County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $325,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is located at 10555 Mary Avenue, Cupertino, CA 95014 and is described as follows: Installation of a new Service Center motorized gate, power and communications to the gate, demolition and removal of existing gate, and repaving of the Service Center driveway and smaller areas within the Service Center yard. The Project must be fully completed within 120 calendar days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about June 1, 2023, but the anticipated start date is provided solely for convenience and is neither certain nor binding. This Project requires a valid California contractors license for the following classifications A General Engineering. The estimated construction cost is $320,000

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents