Similar Projects
(130.8-Mile) Litter/ Debris Removal from Edge of Pavement to the Pedestrian Barrier on I-94 (Edens Expwy)/ US 41 (Skokie Hwy) Expressway from Clavey Rd to I-90 (Kennedy Expwy)
Infrastructure
Bidding

(130.8-Mile) Litter/ Debris Removal from Edge of Pavement to the Pedestrian Barrier on I-94 (Edens Expwy)/ US 41 (Skokie Hwy) Expressway from Clavey Rd to I-90 (Kennedy Expwy)
Infrastructure
Bidding

Refuse and Recyclable Material Collection
Term Contract
Post-Bid
Chicago Heights, IL

Snow Removal and Salting Services
Term Contract
Post-Bid
Kildeer, IL 60047

Removal and Disposal of the Existing Asphalt Pavement, Building Demolition
Results
Elgin, IL 60120

Dust Collection System
Results
Arlington Heights, IL

(133.2-Mile) the Improvement Consists of Litter/ Debris Removal from Edge of Pavement to the Pedestrian Barrier on i-80 Expressway from I-294 to i-355
Infrastructure
Bidding

2020-2021 University District Parking Lot Snow Removal
Post-Bid
Champaign, IL

Sludge Hauling and Disposal - Rantoul Wastewater Treatment Plant
Results
Rantoul, IL 61866

Waste and Recycling Collection Services
Infrastructure
Bidding
Oak Brook, IL 60523

2020-2021 Downtown District Parking Lot Snow Removal Contract
Post-Bid
Champaign, IL

ISWM - Refuse and Recycling
Term Contract
Results
Scott Air Force Base, IL 62225

Demolition And Site Clearance Of Identified Structures
Infrastructure
Bidding
Belleville, IL

Snow Removal
Term Contract
Post-Bid
Maquon, IL 61458

Snow Services
Term Contract, Alteration
Results
Orland Park, IL

Last Updated 03/02/2022 02:12 PM
Project Title

Sludge Removal and Land Application

Physical Address View project details and contacts
City, State (County) Scott Air Force Base, IL   (Saint Clair County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In accordance with the Statement of Work (SOW), the contractor must be fully accredited to remove sludge in accordance with the Illinois Environmental Protection Agency (IEPA). Contractor shall provide all labor, equipment, material and transportation required to remove treated sludge from the wastewater treatment plant. Sludge removal shall be required up to four times per year, disposing and estimated total of 600,000 gallons of anaerobically digested liquid sludge.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents