Similar Projects
16-Inch Water Line Crossing
Infrastructure
Bidding
Waco, TX 76700

TSTC Water/Wastewater and Pedestrian Mall Improvements
Infrastructure
Post-Bid
Less than $3,147,000 est. value
Waco, TX

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water Utilities Fire Hydrant Maintenance Project
Results
Waco, TX 76702

Highway 84 Corridor Wastewater System Improvements Phase 2 Contract A
Construction
Less than $8,102,100 est. value
McGregor, TX 76657

Highway 84 Corridor and Val Verde 16-Inch Water Line Extension
Results
Waco, TX

North Crooked Creek Road Water Line Improvements
Results
Waco, TX

State Highway 6 / Loop 340 Utility Relocation - Part A
Results
$3,100,000 est. value
Waco, TX 76700

Highway 84 Corridor Wastewater System Improvements Phase 2 Contract B
Results
Less than $4,130,000 est. value
Waco, TX

State Highway 6-Loop 340 Utility Relocation Part B
Results
$8,500,000 est. value
Waco, TX 76700

Foster Branch Addition Water Improvements Lots 1-6
Results
Bruceville-Eddy, TX

Construction of Water Improvements - James Killough
Results
Bruceville-Eddy, TX

Waco Drive Utility Crossing Project
Infrastructure
Results
Waco, TX

Large Water Meter Replacement Project
Infrastructure
Results
Waco, TX

Mesquite Tree Lift Station Force Main Reroute
Infrastructure
Results
$180,000 est. value
Lacy-Lakeview, TX

Last Updated 04/01/2022 09:40 AM
Project Title

Summit Ridge Force Main Extension

Physical Address View project details and contacts
City, State (County) Woodway, TX 76712   (McLennan County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $69,392
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all necessary materials, equipment, plant, labor, superintendence and incidentals required for the construction of: City of Woodway Summit Ridge Force Main Extension. Major Items of Work Include Approximately: 830 LF of 6" PVC Force Main located along Sandalwood Drive in Woodway, Texas.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents