Similar Projects
Van Buren Middle School Design/Construct Phase 1
New Construction
Conception
$30,333,333 est. value
Albuquerque, NM 87108

Eldorado High School New Title IX PE/Gym Wing
New Construction
Conception
$33,600,000 est. value
Albuquerque, NM 87111

Chaparral Middle School Replacement
New Construction - 87,000 SF
Design
$8,000,000 est. value
Alamogordo, NM

Constructing a Track and Field at Bureau of Indian Education (BIE)
Infrastructure
Design
$600,000 CJ est. value
Crownpoint, NM 87313

NM 74 - PoPay Avenue Intersection Project
Infrastructure
Bidding
$2,200,000 CJ est. value
Ohkay Owingeh, NM 87566

Links Trail Rehabilitation
Infrastructure
Bidding
$500,000 CJ est. value
Ruidoso, NM 88345

Construction of the Loving Municipal Schools Miscellaneous New Facilities, Additions and Renovations
Renovation, Addition
Post-Bid
Albuquerque, NM

RFQ D/B - Design-Build Services for the Cafeteria Building at the Albuquerque Job Corps Center
New Construction, Infrastructure - 11,600 SF
Post-Bid
$10,000,000 CJ est. value
Albuquerque, NM 87104

District Wide General Construction (GB-98) Services
New Construction
Results
Carlsbad, NM

Calabacillas Grade Control Structure (GCS) 2 Extension
Infrastructure
Results
$545,000 est. value
Albuquerque, NM 87114

International School at Mesa Del Sol
New Construction - 1,089,000 SF
Construction
$10,000,000 CJ est. value
Albuquerque, NM 87105

SAMS Academy Charter School
New Construction - 37,125 SF
Construction
$6,700,000 est. value
Albuquerque, NM 87114

Sunport Place Hotel
New Construction, Infrastructure - 72,267 SF
Pending Verification
$28,000,000 CJ est. value
Albuquerque, NM 87106

Fiesta Subaru
New Construction, Infrastructure - 44,726 SF
Pending Verification
$11,800,000 CJ est. value
Albuquerque, NM 87110

New Indoor Swimming Pool - Las Cruces Regional Aquatic Center
New Construction, Infrastructure
Conception
$18,000,000 CJ est. value
Las Cruces, NM 88001

Last Updated 04/11/2023 05:44 PM
Project Title

Fourth Hobbs Middle School

Physical Address View project details and contacts
City, State (County) Hobbs, NM 88240   (Lea County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $65,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 11 2023 this project is a master plan project and is about 50%.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents