Similar Projects
USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Russell Independent High School Restrooms - Phase A
New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
Ashland, KY 41101

Removal and Dewatering of Solids
Infrastructure
Post-Bid
$2,500,000 CJ est. value
Russell, KY 41169

Asphalt Resurfacing-Danleyton to Flatwoods Road (KY 207) (MP 12.611)
Infrastructure
Results
Greenup, KY 41144

Asphalt Resurfacing - (KY 2541)
Infrastructure
Results
KY

Sidewalk Project
Infrastructure
Post-Bid
$500,000 CJ est. value
Flatwoods, KY 41139

Median - Country Music Highway (US 23)
Infrastructure
Results
KY

Ohio River Road (Ky 3116) - Asphalt Resurfacing
Infrastructure
Results
KY

MP 3.875 to MP 8.290 - Pavement
Infrastructure
Results
KY

MP 2.483 to MP 3.521 - Asphalt Resurfacing
Infrastructure
Results
KY

Asphalt Resurfacing - Coal Branch Road (KY 827)
Infrastructure
Results
$600,000 est. value
Greenup, KY 41144

Asphalt Resurfacing - Bellefonte Street (KY 244)
Infrastructure
Results
$600,000 est. value
Bellefonte, KY 41101

Asphalt Resurfacing - KY 3105
Infrastructure
Results
$300,000 est. value
Raceland, KY 41169

Asphalt Resurfacing - Ashland Drive (KY 1725)
Infrastructure
Results
$600,000 est. value
Russell, KY 41169

Football Locker Room Renovations and Addition
Addition, Demolition, Renovation, Infrastructure - 4,600 SF
Results
$2,081,959 CJ est. value
Raceland, KY 41169

Last Updated 02/10/2023 03:10 AM
Project Title

Improve KY-207 From the Industrial Parkway to the KY-693 Intersection

Physical Address View project details and contacts
City, State (County) Flatwoods, KY 41139   (Greenup County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $32,900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improve KY-207 From the Industrial Parkway to the KY-693 Intersection in Flatwoods.(08ccn)(16ccr) Milepoints: From MP 10.932 To 15.880 Purpose and Need: New Route As of February 10, 2023, the project is in Conceptual status. Anticipated Letting Year is 2026. KYTC - Improve KY-207 From the Industrial Parkway to the KY-693 Intersection in Flatwoods *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents