Similar Projects
South Randolphville Road Warehouse Addition
Addition - 151,708 SF
Conception
Piscataway, NJ 08854

Monroe Self Storage - Cube Smart
New Construction - 31,772 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Monroe Township, NJ

Festival Plaza Additions
New Construction - 43,317 SF
Design
Edison, NJ 08817

Case Drive Warehouse/Distribuiton Building
New Construction - 49,200 SF
Design
$5,000,000 to $10,000,000 CJ est. value
South Plainfield, NJ 07080

Cotters Lane Warehouse
New Construction - 60,000 SF
Sub-Bidding
$5,000,000 to $10,000,000 CJ est. value
East Brunswick, NJ 08816

Ace Wire & Cable Phase 2 Addition
Addition - 12,000 SF
Sub-Bidding
Avenel, NJ 07001

Circle Drive Warehouse
New Construction - 30,210 SF
Post-Bid
Piscataway, NJ 08854

Carteret Waterfront Walkway
Post-Bid
Carteret, NJ 07008

East William Street Proposed Pathway and Parking Lot Improvements
Results
$247,831 est. value
Woodbridge, NJ 07095

Adult Corrections Parking Lot
Results
$1,383,383 est. value
North Brunswick Township, NJ

Extra Space Storage - Woodbridge
New Construction, Demolition - 140,798 SF
Construction
$4,755,000 est. value
Fords, NJ 07095

Public Storage
New Construction - 96,750 SF
Construction
South Plainfield, NJ 07080

Heller Warehouse - Amazon
New Construction - 800,000 SF
Pending Verification
$3,762,000 est. value
Dayton, NJ 08810

Animal Supply Company Expansion
Addition
Pending Verification
Monroe Township, NJ 08831

Washington Avenue Warehouses
New Construction - 360,000 SF
Conception
$10,000,000 CJ est. value
Piscataway, NJ

Last Updated 12/06/2021 10:32 AM
Project Title

Fairway Lane Warehouses

Physical Address View project details and contacts
City, State (County) Old Bridge, NJ 08857   (Middlesex County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Warehouse/Storage
Contracting Method
Project Status Obtained from a News Source
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes a total of 230 loading docks are proposed for the warehouses, as well as a total of 10 drive-in doors with ramps and 430 trailer parking spaces.

Details

4 Warehouse/Storage, 1,560,000 SF New Construction, 195.21 Acres, 430, New Construction, Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents