Similar Projects
Wastewater Treatment Plant Improvements at the Business and Technology Park
New Construction
Bidding
$7,002,000 est. value
Sikeston, MO

Sikeston Board of Municipal Utilities - North Industrial Park Waste Water Treatment Plant
Infrastructure
Bidding
$7,002,000 est. value
Sikeston, MO

Warrenton WWTP Ultraviolet Disinfection System
New Construction
Post-Bid
Warrenton, MO

Wastewater Treatment Facility Improvements at Jackson County Public Works Vehicle Service Center
New Construction
Post-Bid
Grain Valley, MO

Wastewater Treatment Facility Improvements
New Construction
Results
Jonesburg, MO

Water Reclamation Center Phase 3 Expansion
New Construction
Results
Wentzville, MO

Wastewater Treatment Facility Headworks Repairs - 2022
Renovation
Bidding
$100,000 est. value
Kansas City, MO 64152

Waste Water Treatment Facility Peak Flow Disinfection Improvements
Renovation
Post-Bid
$200,000 est. value
Saint James, MO

Monroe City WWTP Improvements
New Construction
Results
Monroe City, MO

Wastewater Treatment Facility Improvements Moberly Correctional Center
Renovation
Bidding
$900,000 est. value
Moberly, MO 65270

Wastewater System Improvements
Renovation
Post-Bid
$1,600,000 est. value
Greenfield, MO

Waste Water Treatment Building – Blue River Annex
New Construction
Results
Kansas City, MO

WWTP Snail Removal Structure Renovation
Renovation
Post-Bid
$360,000 est. value
Monett, MO

Bissell Point WWTF Foam Suppression and Biofilter Rehabilitation
Renovation
Results
Saint Louis, MO 63107

Mississippi Plant Clarifier No. 3 Upgrade
Renovation
Results
Saint Charles, MO 63301

Last Updated 06/23/2022 01:06 AM
Project Title

Aerobic Digester No. 1 Improvements

Physical Address View project details and contacts
City, State (County) Smithville, MO   (Clay County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes, but is not limited to, the following: 1. Demolition and cleaning of Aerobic Digester No. 1 Aeration Equipment. 2. Installation of new Floating Aerator. 3. Construction of new operating platform, outfitted with Davit Crane and Decant Pump. 4. Construction of decant piping from Aerobic Digester No. 1 to SBR headworks. 5. Installation of new Sludge Truck Filling Pump in Aerobic Digester No. 1. 6. Associated Civil, Electrical, and I&C work. Direct all questions to Derek A. Patrick at derek.patrick@hdrinc.com

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents