Similar Projects
South 23rd Street Sewer Rehabilitation - Phase II - PW-24-12 - City Of Council Bluffs
Infrastructure
Conception
$1,000,000 CJ est. value
Council Bluffs, IA 51501

South 23rd Street Sewer Rehabilitation - Phase II - PW-24-12 - City Of Council Bluffs
Infrastructure
Conception
$1,000,000 CJ est. value
Council Bluffs, IA 51501

Treynor Family Recreation Complex
New Construction, Infrastructure
Design
$4,650,000 CJ est. value
Treynor, IA 51575

Cattlemen's Heritage Beef Processing Plant
New Construction, Infrastructure
Design
$54,000,000 CJ est. value
Council Bluffs, IA 51501

N. 28th Street Storm Sewer Rehab, Phase IV
Infrastructure
Bidding
$1,500,000 CJ est. value
Council Bluffs, IA 51501

N. 28th Street Storm Sewer Rehab, Phase IV
Infrastructure
Bidding
$1,500,000 CJ est. value
Council Bluffs, IA 51501

East Orchard Avenue Water Main Relocation
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Council Bluffs, IA 51503

East Orchard Avenue Water Main Relocation
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Council Bluffs, IA 51503

City-Wide Trail Upgrades - Lake Manawa
Infrastructure
Results
$80,000 est. value
Council Bluffs, IA

CBCSD 2023 Concrete Pavement Repair
Infrastructure
Results
$571,353 CJ est. value
Council Bluffs, IA 51501

Pollard Games Council Bluffs Expansion
Addition, Demolition, Infrastructure - 40,000 SF
Pending Verification
$9,400,000 CJ est. value
Council Bluffs, IA 51501

Acadia Healthcare Behavioral Hospital
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Council Bluffs, IA 51501

Valley View Sewer Rehabilitation - PW-27-10 - City Of Council Bluffs
Infrastructure
Conception
$1,000,000 CJ est. value
Council Bluffs, IA 51503

Bahnsen Park Replica Baseball Field (Yankee Stadium) - PR-23-05 - City of Council Bluffs
Infrastructure
Design
$300,000 CJ est. value
Council Bluffs, IA 51501

450th Street Storm Sewer Improvements
Infrastructure
Post-Bid
$322,688 CJ est. value
Avoca, IA 51521

Last Updated 10/18/2023 01:01 AM
Project Title

CBWW Narrows WTP Well No 3 - Upper Terminus

Physical Address View project details and contacts
City, State (County) Council Bluffs, IA 51501   (Pottawattamie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

CBWW Narrows WTP Well No 3 - Upper Terminus Site Directions: Project is located at the Narrows Water Treatment Plant site in Council Bluffs, Iowa, north of North 25th Street. The Work includes the furnishing of labor, materials, equipment and services for the construction of the following: Well facilities for Well 03. This includes, but is not limited to, the following: Construction of an at-grade well pad and a 12 FT wide access road, each constructed of crushed stone. Construction of an at-grade cast-in-place concrete well base ring, pump support concrete collar, elevated steel well platform, and steel electrical equipment canopy. Installation of a vertical turbine well pump and miscellaneous valving. Installation of electrical equipment, as well as other related electrical and instrumentation and controls improvements. Construction of a below ground cast-in-place concrete valve vault. Construction of approximately 775 LF of 14 IN DIA raw water main with a maximum bury depth of about 8 FT. Water main construction includes connection to an existing 12 IN raw water main and miscellaneous valves and fittings. Construction of two flushing hydrants. The removal and replacement of an existing flow meter located within an existing concrete manhole.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents