Similar Projects
Construction of Lift Station at Packer Lane
New Construction
Bidding
Richmond, TX

Lift Station No. 1
New Construction
Bidding
TX

Lift Station Control Panel Replacement Project
Post-Bid
Sugar Land, TX 77487

Wastewater Treatment Plant Rehabilitation and Lift Station Conversion
Post-Bid
$1,365,000 est. value
Katy, TX 77449

Interim Lift Station and Sanitary Sewer Collection Facilities to Serve the Denver Miller Residential Area Tract
Results
TX

Third Storm Water Pump Station
Results
$480,000 est. value
Sugar Land, TX 77479

Construction of the Timber Hollow Lift Station
New Construction
Bidding
Katy, TX

Lift Station Rehabilitation for Elkins (No. 24), Baybridge (No. 28), Commonwealth (No. 30) and Auburn Trails (No. 401)
Post-Bid
Sugar Land, TX 77479

Shipmans Cove Storm Water Pump Station
Results
Less than $2,010,000 est. value
Missouri City, TX

CDBG-Dr Improvements to Lift Stations No. 9 and 10
Post-Bid
Rosenberg, TX 77471

Shipmans Cove Lift Station No. 1 and Force Main and Creekmont Lift Station No. 1 Improvements
Results
Less than $1,323,000 est. value
Missouri City, TX

Stormwater Pump Station Pump Replacement
Post-Bid
Sugar Land, TX 77479

Lift Station 7 Rehabilitation
Results
TX

Proposed Water Distribution and Wastewater Collection Facilities to Serve Highland Meadows Lift Station and Offsite Utilities
Results
Less than $488,468 est. value
TX

Lift Station Rehabilitation for First Colony Commons (No. 38), Trudeau (No. 45), Sartartia (No. 403) And Campbell Elementary (No. 509)
Results
$1,000,000 est. value
Sugar Land, TX

Last Updated 05/07/2021 12:14 PM
Project Title

Lakeview Retreat Lift Station No. 3 and Force Main

Physical Address View project details and contacts
City, State (County) TX   (Fort Bend County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of providing the necessary labor, materials, equipment, and supervision to construct Lakeview Retreat Lift Station No. 3 and Force Main including but not limited to mobilization, bonds and insurance; construction of an 8-foot (8') diameter cast-in-place concrete wet well, complete with two (2) submersible pumps with all accessories, riser piping, valves, coatings, fence and gates, site work, concrete pavement, 8-inch (8") on-site sanitary sever piping including well pointing and dewatering as necessary, two (2) on-site manholes, 4-inch (4") on-site force main, water line, one (1) 40-kW diesel engine generator, sound attenuated weatherproof level 2 enclosure and 24-hour integral storage tank, generator concrete pad, automatic transfer switch, load bank testing, lift station control panel, automatic telephone dialer, electrical service disconnect switches, conduit, wire; trench safety system at all depths; Storm Water Pollution Prevention Plan implementation, maintenance, and record keeping; construction staking to be performed by Jones|Carter (one time only) of property corners and wet well center; and hydromulch seeding and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station; and approximately 670 LF of off-site sanitary sewer force main and one (1) off-site corrosion resistant manhole and all else shown on the construction drawings and detailed in the specifications for the off-site sanitary sewer to discharge to the existing system.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents