Similar Projects
2021 Curb Replacement
Conception
$400,000 est. value
Cedar Rapids, IA

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

Visitor Center Breezeway and Bridge Restoration 36698
Renovation, Infrastructure
Design
$250,000 to $500,000 est. value
Harpers Ferry, IA 52146

Finkbine Street and Parking Lot 5 Paving Replacement
Infrastructure
Bidding
$200,000 est. value
Des Moines, IA 50319

Watrous Avenue from SouthWest 56th Street to SouthWest 61st Street
Infrastructure
Bidding
$1,700,000 est. value
Des Moines, IA 50315

Cedar Valley Nature Trail Rehabilitation
Infrastructure
Post-Bid
$180,000 est. value
Ely, IA

Meskwaki Pedestrian Trail
Infrastructure
Post-Bid
Tama, IA

Gilbert Court Sidewalk Infill
Results
Iowa City, IA

High School Parking Lot
Results
Waverly, IA

Bettendorf Road Repairs For 18Th Street
New Construction, Alteration
Pending Verification
Bettendorf, IA 52722

Cherokee Trail Phase 2B from Cherry Hill Park through Cherokee Park
Conception
$3,000,000 est. value
Cedar Rapids, IA 52405

Rock Creek Greenway Trail Improvements
Infrastructure
Bidding
$125,300 est. value
Ankeny, IA 50023

Camp Dodge S-05 Parking Lot and S-38 Drainage Improvements
Infrastructure
Post-Bid
Johnston, IA

8th Avenue South West from 15th Street South West to Rockford Road
Results
$3,220,000 est. value
Cedar Rapids, IA 52407

Lindale Trail Phase II from I-380 to Council Street North East
Conception
$1,200,000 est. value
Cedar Rapids, IA

Reported 05/20/2022 12:00 AM
Project Title

Middle School Parking Lot Improvements 2022

Physical Address View project details and contacts
City, State (County) Mount Pleasant, IA   (Henry County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The kinds and approximate quantities of the major items of work include: 1400 C.Y. of Excavation Class 10 Roadway & Borrow. 550 C.Y. of Modified Subbase. 2940 S.Y. of Engineering Fabric. 3120 S.Y. of PCC Pavement, HMA, Driveway & Sidewalk Removal. 2880 S.Y. of 6 IN. thick fully reinforced PCC Street Paving, Parking & Driveway 2880 S.Y. of 6 IN. thick fully reinforced PCC Street Paving, Parking & Driveway Colored Crosswalk. 260 S.Y. of Sidewalk. P.C. Concrete, 6 IN. 3 EACH of SW-401 Storm Manhole 72" 3 EACH of SW-505 Intake. 1 EACH of 6" Hicken Bottom Intake. 25 L.F. of 6" Storm Sewer. 695 L.F. of 15" Storm Sewer. 285 L.F. of 30" Storm Sewer. 230 L.F. of 36" Storm Sewer.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents