Similar Projects
Last Updated | 09/14/2022 02:35 PM |
Project Title | Outfall and Roadside Ditch Maintenance |
Physical Address | View project details and contacts |
City, State (County) | Brooksville, FL 34613 (Hernando County) |
Category(s) | Single Trades |
Sub-Category(s) | Service/Term Contracts |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $250,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Counties: Hernando, Pasco Outfall and Roadside Ditch Maitenance Limits: Midpoint Project(s): 41602637226(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: N/A The work under this Contract consists of the maintenance of outfall and roadside ditches, cleaning and grading in Hernando and Pasco Counties. The contract will be awarded at the full budgetary amount of $250,000.00; low bid will set the unit price. The quantities shown on the Bid Price Proposal are approximate and only represent estimated planned requirements based on historical or specific project needs. The Department does not guarantee any maximum or minimum quantity, any range of quantities, or the exact quantities shown for each bid item. The Department's estimated quantities and the Contractor's bid price will be used to calculate a total bid amount. This total bid amount will then be used to determine the low bidder; however, actual payment under the awarded contract will be based on actual quantities completed. For this Contract in which specific sites are not identified at the time of letting, the Engineer will issue a Work Document. Work Documents will identify the location, description, amount of work to be accomplished, and the number of calendar days to complete the work. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 003 Outfall and Roadside Ditch Maintenance |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |