Similar Projects
Finished Water Pump Replacement
Term Contract
Bidding
$260,000 est. value
Billerica, MA

Redevelopment, Surging and Chemical Treatment of 15 Gravel Packed Wells at Brown`s Crossing Wellfield
Infrastructure
Bidding
Wilmington, MA

Well Cleaning 2 and 8 Redevelopment
Post-Bid
Sudbury, MA

Sewer Pump Station On-Call Repair & Maintenance
Post-Bid
Less than $67,300 est. value
Burlington, MA

Irrigation Well at Veterans Memorial Park
Results
$15,342 est. value
Dracut, MA 01826

Redevelopment, Surging and Chemical Treatment of Two (2) Gravel Packed Wells
Results
Wilmington, MA

Cleaning and Redeveloping of Chestnut Well 3 and Cranberry Well
Post-Bid
Hudson, MA

Cleaning of Wells 10 and 11
Results
Less than $60,000 est. value
Burlington, MA

Two Irrigation Wells at 115 Cochituate Road and 317 Hollis Street
Post-Bid
Framingham, MA 01701

Replacement Well 5A
Results
Less than $450,000 est. value
Dracut, MA

Private Sector Sump Pump Removal and Sewer System Rehabilitation
Post-Bid
Belmont, MA

Cleaning and Redevelopment of Country Road Well
Results
Less than $40,000 est. value
Westford, MA 01886

Furnish and Deliver Residential Grinder Pump Systems
Post-Bid
Ayer, MA

Replace Sewer Macerators
Results
Ayer, Devens, MA 01434

Project Is Design, Permitting, Drilling and Installation of Potable Well System
Infrastructure
Post-Bid
Ashby, MA

Reported 02/04/2022 12:00 AM
Project Title

Cleaning and Redevelopment of Howard Road and Nutting Road Wells

Physical Address View project details and contacts
City, State (County) Westford, MA 01886   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall furnish all necessary equipment, labor, and materials to clean and redevelop the Howard Road and Nutting Road Wells. The Howard Road site includes 6 wells and the Nutting Road site includes 2 wells.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents