Similar Projects
Services for Group A Fire Sprinkler Installation Design Build
Bidding
Less than $6,958,886 est. value
Decatur, Stone Mountain, GA 30032

Fire Extinguisher and Fire Suppression Systems Service
Bidding
GA

Fire Suppression, Fire Extinguisher, Sprinkler/Riser, Hood Fire Suppression Inspection and Maintenance
Post-Bid
GA

North Springs High School Fire Alarm Replacement
Post-Bid
Atlanta, GA 30328

Fire Alarm Inspections, Monitoring and Maintenance
Results
Calhoun, GA

Removal and Replacement of Fire Pump and Associated Components at Peabody Apartments
Results
Less than $60,000 est. value
Augusta, GA 30901

Fire Suppression Service
Bidding
Moody AFB, GA

Fire Safety Inspection, Testing and Maintenance
Post-Bid
Savannah, GA 30345

Georgetown K-8 HVAC and Fire Alarm Replacement
Results
Savannah, GA 31419

Group B Fire Sprinkler Installation Design Build
Bidding
Less than $7,660,102 est. value
Atlanta, Doraville, Stone Mountain, Tucker, GA 30083

Collins Hill High School Fire Alarm Replacement
Post-Bid
Suwanee, GA 30024

Derenne Middle School Fire Alarm Replacement Project
Results
Savannah, GA 31401

Group C Fire Sprinkler Installation Design Build
Bidding
Atlanta, Chamblee, Doraville, Dunwoody, Tucker, GA 30338

Sprinkler System
Post-Bid
Bainbridge, GA 39817

Inspection and Testing of Water Fire Protection Systems
Term Contract
Results
Decatur, GA

Last Updated 11/20/2020 11:31 AM
Project Title

Design and Construction Orange Hall Fire Protection System

Physical Address View project details and contacts
City, State (County) Saint Marys, GA 31558   (Camden County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the Design and Construction of the Orange Hall Fire Protection System. To provide and install the work per the approved engineered design which may include: Fire Sprinkler System • Furnish Install New Concealed Pipe Fire Sprinkler System per Codes & Standards Painted Black Steel Piping and Fittings Pendant and Sidewall Type Sprinkler Heads Standard Coverage Brass and Chrome Finish 1st Floor 2nd Floor • Furnish Install New Surface Mounted Pipe Fire Sprinkler System per Codes & Standards Painted Black Steel Piping and Fittings Pendant and Sidewall Type Sprinkler Heads Standard Coverage Brass and Chrome Finish Basement • Furnish and Install New Pipe Riser and Associated Components • Furnish and Install Air Compressor (If needed) City of St. Marys, GA Orange Hall Fire Protection System • Furnish and Install New Insulated Double Check Backflow Preventer and Fire Department Connection (FDC) Auxiliary Drain / Drum Drips • Furnish and Install New PVC Underground Fire Main from City Main Ground Restoration to Areas directly affected from digging for placement of Fire Main Connection Seed and Straw Fire Alarm System • Furnish and Install Fire Alarm Voice-Evacuation System System Components include: 1. Fire Alarm Control 2. Fire Alarm Transmitter for Remote Monitoring 3. Surge Protector 4. Amplifier 5. Speakers 6. Strobes 7. Smoke Detectors 8. Pull Stations 9. Audible Base 10. Control Relays 11. Monitor Modules 12. Duct Detectors 13. Associated Wiring

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents