Similar Projects
SR 0522 over Jacks Creek
Infrastructure
Conception
$2,300,290 CJ est. value
Mc Clure, PA 17841

SR 0522 over Jacks Creek
Infrastructure
Conception
$2,300,290 CJ est. value
Mc Clure, PA 17841

SR 2007 over Tributary to Middle Creek
Demolition, New Construction, Infrastructure
Design
$380,000 CJ est. value
Mount Pleasant Mills, PA 17853

SR 2007 over Tributary to Middle Creek
Demolition, New Construction, Infrastructure
Design
$380,000 CJ est. value
Mount Pleasant Mills, PA 17853

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Township Road Project
Infrastructure
Results
Selinsgrove, PA

Township Bituminous Sealcoat Project
Infrastructure
Results
Selinsgrove, PA

Susquehanna Commons
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Selinsgrove, PA 17870

Susquehanna Commons
New Construction, Infrastructure
Pending Verification
$13,000,000 CJ est. value
Selinsgrove, PA 17870

Dinius Ave to Water Tower Road
Infrastructure
Conception
$360,000 CJ est. value
Middleburg, PA 17842

SR 522 over Tb Middle Crk
Demolition, New Construction, Infrastructure
Design
$3,525,000 CJ est. value
Middleburg, PA 17842

Paving
Infrastructure
Post-Bid
Beaver Springs, PA

Borough Road Project
Infrastructure
Results
$300,000 est. value
Middleburg, PA

T-481 over Tuscarora Crk
Demolition, New Construction, Infrastructure
Conception
$2,115,000 CJ est. value
Center Township, PA 17842

Last Updated 05/05/2023 11:05 AM
Project Title

SR 522 from Willow Avenue to Swinehart Drive

Physical Address View project details and contacts
City, State (County) Middleburg, PA 17842   (Snyder County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,074,325 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The description and location of the project are as follows: Milling and resurfacing of existing roadway, including flexible base replacement, scratch and wearing courses, design and construct ADA curb ramps, guide rail upgrades, pavement markings, and other miscellaneous construction as indicated on approved drawings for STATE ROUTE 522, SECTION 084, from the intersection with Church Street at Segment 0390 Offset 0985, to approximately 0.1 mile west of the intersection with Renninger School Road at Segment 0420 Offset 0500, and STATE ROUTE 104, SECTION 030, to approximately 0.4 mile south of the intersection with SR 3008 (Paxtonville Road) at Segment 0230 Offset 2321, to the intersection with SR 522 at Segment 0250 Offset 1489, all in the Borough of Middleburg and Franklin Township, Snyder County. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 0.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays 408 Version: 2020-6 PennDOT - SR 522 from Willow Avenue to Swinehart Drive *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents