Similar Projects
Complete Roof Assembly
Alteration
Bidding
$500,000 est. value
Calipatria, CA 92233

Roofing Project 2022
Alteration
Bidding
$500,000 est. value
Oxnard, CA

Napa High School - Gymnasium, Boys and Girls Locker Room Roof Replacement, Skylights and HVAC Upgrades
Alteration
Sub-Bidding
Napa, CA 94558

Administration Building Roof Replacement
Alteration
Post-Bid
Oakland, CA 94612

PWA Roof Restoration
Alteration
Post-Bid
Hayward, CA 94544

Sheriff Admin Morgue Roof Project
Alteration
Results
$250,000 est. value
Woodland, CA 95776

Repair Building Roof
Alteration
Results
$2,300,000 est. value
CA

2022 Roofing Replacement Package
Alteration
Bidding
Modesto, CA 95355

Master As-Needed Agreement M16 Roofing Services
Alteration
Post-Bid
$700,000 est. value
San Francisco, CA

Regional Specialty Roofing Job Order Contract
Alteration
Results
$500,000 est. value
Long Beach, CA

Metal Roof Replacement, Phase 3, Tierra Linda Elementary School
Alteration
Bidding
$600,000 est. value
Camarillo, CA 93012

Rooftop Solar Panel Repairs
Term Contract
Post-Bid
Richmond, CA 94801

Roof Replacement for 14 Roofs
Alteration
Results
$700,000 est. value
Sacramento, CA 95827

Roof Replacement
Alteration
Bidding
$585,000 est. value
Agoura Hills, CA 91301

La Cima Conservation Camp - Additional Roof Replacements
Term Contract
Post-Bid
Julian, CA

Reported 05/05/2022 09:07 AM
Project Title

Noriega Early Education School Roof Repairs and Replacement

Physical Address View project details and contacts
City, State (County) San Francisco, CA 94122   (San Francisco County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is generally described as, but not limited to Removal of existing built-up roof (BUR) system and its replacement with new modified bitumen roofing over wood deck including associated wood fascia, sealants, sheet metal flashings, gutters, downspouts, roof drains, cement plaster patch work, and painting of the school’s north wing building and covered walkway. The Work will also involve miscellaneous metal fabrications and gate hardware; replacing deteriorating wood columns, steel post straps, and pedestal concrete post footings at the covered walkway; and replacing restroom signs. Hazardous materials abatement is included. The DVBE Goal is 3%.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents