Similar Projects
Brentwood Boulevard Sewer and Water Main - 562-56392 - City of Brentwood
Infrastructure
Conception
$2,812,000 est. value
Brentwood, CA

Pump Station 2.4 Installation - City of Brentwood
Infrastructure
Conception
Brentwood, CA 94513

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Pipeline Project
Alteration
Bidding
$3,250,000 est. value
La Mesa, CA

San Antonio Avenue Transmission Water Main, Phase 2- 8th Street 30-inch and 36-inch Diameter Transmission Water Main
Infrastructure
Bidding
$4,765,200 est. value
Rancho Cucamonga, CA 91730

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Professional Engineering Services For Water System Improvements In Madera County Maintenance District No. 36 Eastin Arcola
Infrastructure
Post-Bid
Madera, CA

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

2022 CDBG Princeton Street Watermain Replacement Project
Infrastructure
Bidding
$75,000 to $100,000 est. value
Delano, CA 93215

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

R Line Upgrade Phase 2 - Salt Creek Project
Infrastructure
Bidding
$800,000 est. value
Imperial, CA

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

Reported 06/13/2022 04:55 PM
Project Title

Waterline Improvement - Kent Drive - City Of Brentwood

Physical Address View project details and contacts
City, State (County) Brentwood, CA 94513   (Contra Costa County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected January 2024
Bids Due View project details and contacts
Estimated Value $336,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Water Master Plan identified this project as a priority to improve distribution system operation and efficiency. This project will install a new 12" waterline on Kent Drive between Grenadier Way and Tayberry Lane providing additional flow capacity on a critical connection between the east and west halves of Zone 2. The new 12" waterline will parallel the exiting 8" waterline. The project is included in the City of Brentwood's FY 2021/2022-2025/2026 Capital Improvement Program (CIP). As of June 10, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents