Similar Projects
Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

RFP - State Street Campus Garage Survey
Term Contract
Bidding
Madison, WI 53715

RFP Design - Pickleball Court Lighting
Infrastructure
Bidding
$500,000 CJ est. value
Sun Prairie, WI 53590

Madison AE IDIQ Base IDIQ Contract for Wm. S. Middleton VA Hospital
Post-Bid
$3,000 to $1,000,000 est. value
Madison, WI 53705

Water Management Plan
Term Contract
Post-Bid
WI

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Microbial to Radio Hall 15kV Cable Replacement Phase II/ University of Wisconsin-Madison
Renovation
Pending Verification
$4,999,000 CJ est. value
Madison, WI 53706

RFQ Design - Truax Southwest Region Office Roof Replacement
Renovation
Pending Verification
$500,000 CJ est. value
Madison, WI 53704

RFP Design - Multiple Playground Replacements Design and Engineering
Infrastructure
Bidding
$200,000 CJ est. value
Sun Prairie, WI 53590

Design for Highway 19 and Grand Avenue and Grand Avenue and Blue Heron Boulevard Intersections
Infrastructure
Post-Bid
Sun Prairie, WI

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

University Ridge Irrigation System Replacement - University of Wisconsin System
Renovation
Pending Verification
$2,500,000 CJ est. value
Madison, WI 53706

RFP - Cross Connection Control and Grease Trap Services
Term Contract
Bidding
Fitchburg, WI 53711

Regional A-E Survey and Mapping Services Multiple Award Task Order Contract
Term Contract
Post-Bid
$25,000,000 to $3,500,000 est. value

Last Updated 01/13/2023 01:32 AM
Project Title

RFP Engineering - Flow Splitter Improvements

Physical Address View project details and contacts
City, State (County) Madison, WI 53713   (Dane County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Construction start expected January 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Madison Metropolitan Sewerage District (District or MMSD) is requesting proposals for engineering consulting services (RFP) associated with the Flow Splitter Improvements Project (project). The purpose of this project is to rehabilitate, modify, and/or replace the existing flow splitter structure at the Nine Springs Wastewater Treatment Plant (NSWWTP). This project and associated scope of services is intended to be completed in several stages. This RFP is seeking an engineering consultant to conduct an alternatives analysis, a preliminary design, as well as detailed design and construction services for the project. Stage 1 will be the Alternatives Analysis and Stage 2 will be the Preliminary Design. No verbal statement made by a district employee or anyone else is binding, nor shall such a statement be considered an official part of this public proposal. The district is federal and state tax exempt and reserves the right to reject any or all proposals or to waive any technicality and accept any proposal which may, in its opinion, be advantageous to the district. The method of Contractor Selection has not been Determined at this time.

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents