Similar Projects
Buice Road (West) Traffic Calming Project
Infrastructure, Alteration
Bidding
Johns Creek, GA

Baseball Field Drainage For Milton And Northview High Schools
Infrastructure
Post-Bid
Johns Creek, Milton, GA 30004

Sweetwater Creek Rehabilitation - Phase 1
Results
Less than $2,022,280 est. value
East Point, GA

5280 North Powers Ferry Road Phase 1 Streambank Repair and Culvert Replacement Project
Results
Sandy Springs, GA 30328

T32-D7-Drainage-I75 Northside-105634
Results
GA

Restraining Joint Fittings for Cast and Ductile Iron Pipe
Term Contract
Results
Atlanta, GA 30303

PVC Schedule 40 DWV Pipe
Term Contract
Results
GA

Pipe Replacement at 345 High Oaks Court
Results
Johns Creek, GA 30005

Old Savannah Square, Resurfacing and Drainage Improvements
Results
Union City, GA 30291

City Hall Pond Rehabilitation and Expansion
Results
Roswell, GA 30075

Public Works Maintenance and Operations Services
Results
Milton, GA 30004

T32-D7-Drainage Rehab-Various-107712
Results

Hammond Park Erosion and Improvement Project
Results
Sandy Springs, GA 30328

Saddlesprings Drive Culvert Repair
Results
Milton, GA 30004

4878 Long Island Drive Drainage Improvement
Results
Atlanta, GA 30342

Last Updated 08/19/2021 09:06 AM
Project Title

North Springs High School Baseball Outfield Slope Repair

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30328   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, materials, tools, and equipment necessary for the repair of a failed slope on the baseball field. The scope of this contract is also to provide maintenance of the detention pond that has accumulated sediment and requires clearing of all existing trees at North Springs High School Repair of Outfield Slope will consist of: 1. Repair failed slope at left center field. 2. Install new storm inlet and pipe to increase runoff capture and avoid future failure of weak slope area. 3. Clear disturbed area of existing pines and restabilize with slope-specific seed mixture once repaired. Detention Pond Maintenance will consist of: 1. Clear all existing trees (primarily pine trees). 2. Regrade with sediment removed to the bottom of the lowest orifice in the existing outlet structure. 3. Restabilize with slope- specific seed mixture. Location: North Springs High School, 7447 Roswell Road NE, Sandy Springs, GA 30328.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents