Reported 07/28/2020 12:00 AM
Project Title

N059--Security Camera Installation Brand name or Equal DigiOpt Replacement

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78229   (Bexar County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor will be required to design the system in a fashion that allows the system to be internal to the campus on a standalone Network and sent through a secure point to point tunnel between the different locations within the Central Texas area. The New system must support full integration into the Software house C-Cure system and existing Victor video Edge. The system and any new cameras added must support facial recognition, suspect following and some cameras that will be placed outside in areas determined by the VA police will need to have a License plate capture function. The New system must be designed for a 90-day recording of video with an estimated 65% activity at 10fps. (This will vary depending on the camera locations) and have a search function that allows searching for activity within a certain area of the frame. The New system must have a 2-year warranty on all parts and labor (this does not include the cameras that are already in existence). And must include a 2-year Licenses and SSA agreements for the completed system. 0002 30.00 EA $00.00 $00.00 Unmanaged Network Switches for Camera system 0003 4.00 EA $00.00 $00.00 Network Video Recorders 0004 90.00 EA $00.00 $00.00 Replacement Cameras 0005 10.00 EA $00.00 $00.00 New PTZ Cameras 0006 30.00 EA $00.00 $00.00 Backup Power supplys UPS to support the switches and NVRs 0007 1.00 JB $00.00 $00.00 Other items need for installation, like J-Hooks, Wiring, and other items needed. Project Overview: The Contractor will be required to design the replacement system in a manor that places the cameras on a standalone network that will interconnect to the existing system over a second NIC card on the NVR The new system must support full integration into the Software house C-Cure system and existing Victor Video Edge. The system and any new cameras added must support facial recognition, suspect following and some cameras that will be placed outside in areas determined by the VA police and COR will need to have a license plate capture function. The new system must be designed for a 90-day recording of video with an estimated 65% activity at 10fps. (This will vary depending on the camera locations) and have a search function that allows searching for activity within a certain area of the frame. The new system must have a 2-year warranty on all parts and labor (this does not include the cameras that are already in existence). And must include a 2-year licenses and SSA agreements for the completed system. All equipment must be TAA compliant. Any wireless equipment must meet the VA FIPS-140-2 requirements. The Contractor will be required to provide multiple training sessions for the End User for the full operation of the system. Employees for the maintenance are already factory trained. The Contractor will be required to create and provide a drawing of all cameras in Temple on the consolidated system. The Vendor must be factory trained and listed as an authorized dealer by American Dynamics to purchase all licenses and SSA agreements for the CTXVHA. 3.2 Known Factors: The Contractor will be required to incorporate all the existing S3 cameras, with the exception of those being replaced, into the new system and add several others into the system. All existing switches and UPS that support the switches are required to be replaced. The Fiber paths and existing cables can continue to be used. Any cabling for new cameras must be cat6A , (all cameras being replaced can be left on the current cabling). Any new interconnections between Com Rooms will be provided by the VA. There are an estimated 275 cameras, mostly S3, in Temple on DigiOpt, on the Temple Campus. The second system, American Dynamics contains about 120 cameras (95% of them are Illustra Pro) in Temple and another est. 300 in Waco. The Cameras on the Victor Software are operational at 100% and are not included in the project except they must be included on the drawings for the Temple Campus. On the DigiOpt there are about 60 Cameras that are needing replacements. There are about 30 Cameras that will need to be added and an estimate of about 10 outdoor PTZ. We are also requiring 100 cameras, to replace about 60 of the S3 cameras that are having issues as well as the addition of the other 30 Dome Cameras and 10 PTX s in Temple. Current network switches and UPS, a total of about 30 each, will be required to be replaced with new unmanaged switches. The NVR s must support multiple network connections. The system can be designed using an internal network for the cameras and a second network connection can be integrated into the rest of the system. Attending a site visit is mandatory to prevent any confusion as to the scope, locations and type of equipment needed to perform this design and install of the new Central Texas Camera System. All Existing cameras require cleaning and adjustments. Building drawings are provided as is and the camera locations are estimates. We do not have any updated drawings that show the exact location of all cameras that are currently installed. 3.3 Constraints on Installation: The Vendor will be required to coordinate all work through the COR, all schedules of installation must be in a manor to not impede the daily operations of the Medical Center and patient care. The normal hours of operation will be from 0800 till 1700, time outside of this will need approval from the COR. The Contractor will be required to supply all tools, equipment, material and personal to perform the installation. The VA will provide an escort for up to 2 teams during installation. Under normal operation there should not be a need for a HEPA cart since the majority cameras are not in direct patient care areas. All wiring installed in spaces that would leave the wring exposed must be installed in EMT conduit. Existing wire trays and J-Hooks may be used. If none exist in an area the contractor will be required to supply. 4.0 Applicable Directives VA 0730 Security requirements All NEC codes as applicable to the installation All OSHA requirements that pertain to the work being performed All FPA codes that pertain to the installation of this system 5.0 Performance Requirements (Identify what the contractor is required to do (major tasks and subtasks). The Contractor will be required to walk the area with the COR and the VA police to outline the area and determine the required coverage and placement for the new cameras. The Contractor will be required to submit the planed installation drawings to the COR for approval prior to proceeding with the installation of that area to ensure the installation meets the proper coverage for that area. The Contractor will work with the COR on making the installation schedule for the new equipment and cameras. The Contractor will provide a digital copy of the drawing of the installation after completion of the project. The Contractor will ensure they have all required equipment prior to installation begin. The Contractor will assist the Electronics Technicians in program the new camera system into the C-Cure system server in Temple. The Contractor will provide a full 2-year warranty on all equipment and services including labor and parts that were installed under this contract. The Contractor will provide multiple sessions of training for the operation to the VA Police. The installation of all equipment and training needs to be completed after 180 days after award of this contract and the final drawings supplied within 60 days of completion of installation. 6.0 Deliverables (List all data required to manage or monitor contractor performance). All equipment determined by the approved design. All training as outlined within the scope of work for the operators of the system. 60 replacement cameras for replacement of existing cameras that are starting to fail. 30 new Dome Cameras installed and 10 PTZ cameras installed. Written and signed warranty letter at completion showing the start date and end date of the warranty period. All licenses and SSA agreement purchased on behalf of the VA. Do Not Directly contact COR during the Solicitation, All Questions should be directed to the Contracting Officer. Attached Drawings of DigiOpt system Camera Locations The Department of Veterans Affairs is seeking both manufacturers and/or distributors of the exact match or functionally equivalent equipment/ services to the following listed above. 52.211-6 Brand Name or Equal.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents