Similar Projects
Energy Management Opportunities - Repair and Model - Chiller Repair
Infrastructure, Alteration
Bidding
$300,000 est. value
East Moline, IL

Habitat for Humanity Senior Rehab Program
Post-Bid
Less than $8,845 est. value
Moline, IL 61265

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

Housing Rehabilitation Program - Concrete, Steps, Electrical, And Hvac (Angel)
Renovation
Results
Rock Island, IL 61201

Chiller Replacement
Results
East Moline, IL 61244

HVAC and Mechanical Products
Term Contract
Post-Bid

Winter Weatherization
Results
Rock Island, IL 61201

Provision & Installation of (3) Columbia Boilers or Equivalent
Post-Bid
Rock Island, IL

Housing Rehabilitation Program - Heating Repairs (Schriner)
Renovation
Results
Rock Island, IL 61201

Boiler Replacements
Post-Bid
Moline, IL 61265

Housing Rehabilitation Program - Water Heater
Results
Rock Island, IL 61201

First Congregational Church Boiler Replacement
Renovation
Post-Bid
Moline, IL 61265

Housing Rehabilitation Program - Furnace
Results
Rock Island, IL 61201

Boiler Replacement
Post-Bid
Moline, IL 61265

2021 HVAC Improvements at Hillside
Results
Hillsdale, IL

Last Updated 05/03/2022 06:10 AM
Project Title

Hot Water Heating Valve Replacement

Physical Address View project details and contacts
City, State (County) Moline, IL 61265   (Rock Island County)
Category(s) Single Trades
Sub-Category(s) HVAC, Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $26,620
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of zone valves on the baseboard heating in the units of Spring Valley and Hillside Heights. Unions will be added at the zone valves and new ball valves installed at each end of the units heat piping. Work also includes the replacement of the fin tube covers. There are 182 units at Spring Valley and 120 Units at Hillside Heights.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents