Similar Projects
Service Street Auto Repair / Colorado Springs
New Construction, Infrastructure
Conception
$1,700,000 CJ est. value
Colorado Springs, CO 80908

New Fire Station - Tri-Lakes Monument Fire Protection District
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Monument, CO 80132

Hancock and Delta Mixed-Use Development
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Colorado Springs, CO 80910

Corvallis
New Construction, Infrastructure
Design
$480,000,000 CJ est. value
Fountain, CO 80925

PPRTA Pipe Lining Projects
Infrastructure
Bidding
$700,000 CJ est. value
Colorado Springs, CO 80903

RFP D/B - D49 Fueling Station Design and Install
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Peyton, CO 80831

Avilla Founders Village / Castlerock
New Construction, Infrastructure - 116,102 SF
Sub-Bidding
$30,000,000 CJ est. value
Colorado Springs, CO 80920

Pioneer Village Road Maintenance Services
Alteration
Post-Bid
Colorado Springs, CO

National Chain Car Dealership / Colorado Springs
New Construction, Infrastructure - 6,827 SF
Post-Bid
$1,000,000 CJ est. value
Colorado Springs, CO 80922

Ada Curb Ramp Retrofit Upgrades, including Removal of Sidewalk
Results
$1,000,000 to $5,000,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Hampton Inn
New Construction
Construction
$2,000,000 est. value
Colorado Springs, CO 80900

Victory Ridge Park
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Colorado Springs, CO 80908

Victory Ridge Park
Infrastructure
Pending Verification
$1,000,000 CJ est. value
Colorado Springs, CO 80908

Wahsatch & Rio Grande Apartments
New Construction, Infrastructure
Design
$78,000,000 CJ est. value
Colorado Springs, CO 80903

Last Updated 09/29/2022 01:32 PM
Project Title

Mt. Cutler Trailhead Improvements (Informal)

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80906   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project seeks to create an enhanced parking area for the Mt. Cutler in North Cheyenne Canon Park, along North Cheyenne Canon Park Road. The improvements are part of the North Cheyenne Canon Park Master Plan and will serve to be an attractive and inviting space for park users with efficient and consistent parking spaces. The scope of work for the project includes providing all the labor, materials and equipment to construct the improvements per the included development plans titled: "North Cheyenne Canon Mt Cutler Trailhead Improvements" Dated September 2022 as per Schedule D Project Plans. Question Acceptance Deadline 10/04/2022 12:00 PM EDT. Bid Bond 5 % Performance Bond 100 % Maintenance Bond 100 % Labor and Materials Bond 100 %

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents