Similar Projects
Cameron Park Drive Widening - Palmer Drive to Sudbury - 72143 - El Dorado County
Alteration
Conception
$6,047,000 est. value
Cameron Park, CA 95682

Delaware Water Quality Project - 36107019 - El Dorado County
Infrastructure
Conception
$400,000 est. value
Pollock Pines, CA 95726

Multifamily Construction
Infrastructure, Renovation
Design
South Lake Tahoe, CA 96150

Multifamily Construction
Infrastructure, Renovation
Design
South Lake Tahoe, CA 96150

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Place Polyester Concrete Overlay
Infrastructure
Post-Bid
$1,650,000 est. value
CA

2022 Bijou 2/3 Waterline Replacement Project
Infrastructure
Results
$2,165,707 est. value
South Lake Tahoe, CA

Clean Culverts, Install Cured-in Place-Pipeliners and Invert Paving
Infrastructure
Results
$6,700,000 est. value
CA

The Landing at Tahoe Resort and Spa Cabins Addition
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
South Lake Tahoe, CA 96150

Mackinaw Hotel
New Construction, Infrastructure - 6,000 SF
Pending Verification
$26,000,000 CJ est. value
Placerville, CA 95667

US 50 / Latrobe Road / El Dorado Hills Boulevard Interchange Improvements Phase 2B - 36104001 - El Dorado County
Infrastructure
Conception
$7,620,000 CJ est. value
Placerville, CA 95667

SpringHill Suites / Placerville
New Construction, Infrastructure
Design
$28,000,000 CJ est. value
Placerville, CA 95667

Asphalt Patch Paving
Term Contract
Post-Bid
Placerville, CA

Roadway Excavation and Install Concrete Drainage Inlet
Infrastructure
Results
$850,000 est. value
CA

Dutch Bros Coffee / Cameron Park
New Construction, Infrastructure - 950 SF
Pending Verification
$300,000 CJ est. value
Cameron Park, CA 95682

Last Updated 04/12/2023 02:33 PM
Project Title

Barton Avenue and 2nd Street Drainage Project

Physical Address View project details and contacts
City, State (County) South Lake Tahoe, CA 96150   (El Dorado County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $1,993,999 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work to be performed includes, but is not limited to: Project sign, traffic control, water pollution control, fugitive dust control, pavement saw-cutting (or grinding), removal and disposal of existing AC pavement, milling of existing AC pavement surfaces, tree removal, construction staking, earthwork grading, off-haul of earthen materials and tree stumps, grading & compaction, new concrete curb, storm drain pipe removal, adjust utilities to grade, water service line relocations, storm drain system construction (drainage inlets, storm drain laterals, storm drain main, storm drain manholes, and treatment basins), sanitary sewer lateral relocations, installation of permeable roadside shoulder area, AC paving, pavement striping and signage, temporary erosion control Best Management Practices, compliance with regulatory permits, establishing revegetation over water quality basin sites, and areas disturbed by construction activity, and all other work as described in the Contract Documents, including, without limitation, project construction drawings, bid documents, Special Provisions, City of South Lake Tahoe Public Improvements and Engineering Standards, and 2018 edition of California Department of Transportation, Standard Specifications. Q&A Deadline 03/24/2023 5:00 PM (PST) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Estimated Bid Value $1,450,000 to $1,550,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents