Similar Projects
OR99/OR99W/OR99E Curb Ramps Project
Infrastructure
Design
$5,000,000 to $10,000,000 est. value
Roseburg, OR 97471

West Hayes Street Improvements
Infrastructure
Bidding
Woodburn, OR 97071

ADA Ramp Improvement Project
Infrastructure
Bidding
$140,000 est. value
Cave Junction, OR

Dirksen Nature Park Trail and Parking Lot Improvements
Infrastructure
Post-Bid
Tigard, OR 97223

Clinton Avenue Parking Lot at Peterson Elementary School
Infrastructure
Post-Bid
Klamath Falls, OR 97603

2021 Sidewalk Safety Program
Infrastructure
Results
$146,720 est. value
Corvallis, OR 97333

US101: Bunker Hill Sidewalks and Flanagan Signal Project on the Oregon Coast Highway
Infrastructure
Results
OR

2022 Paving Improvements at Hwy 155 (Ferry Street) Sidewalk Improvements, 9th Street to Flower Lane
Infrastructure
Bidding
$300,000 est. value
Dayton, OR 97114

Susan Campbell Sidewalk Improvement Project
Infrastructure
Post-Bid
Eugene, OR 97403

NW 174th Ave Sidewalk Infill - NW Santiam Dr to NW Sandpines Ln
Alteration
Results
$100,000 to $200,000 est. value
OR

Fern Drive Improvements
Infrastructure
Bidding
$440,000 to $540,000 est. value
Brookings, OR 97415

Central Oregon Curb Ramps Phase 1
Infrastructure
Post-Bid
$1,000,000 to $2,000,000 est. value

Museum of the Oregon Territory Parking Lot Repair
Infrastructure
Results
$115,000 est. value
OR

Powell Road Improvements - 2022
Infrastructure
Bidding
$880,000 est. value
Milton-Freewater, OR 97862

OR82 Curb Ramps (Wallowa/Lostine) Project
Infrastructure
Post-Bid
$2,000,000 to $5,000,000 est. value
OR

Reported 04/27/2022 12:00 AM
Project Title

Sidewalk and Pedestrian Ramp Improvements

Physical Address View project details and contacts
City, State (County) Newport, OR   (Lincoln County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Quotations, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $140,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of new sidewalk and existing ADA ramp improvements on SE Moore Drive between Hwy 20 and SE Bay Boulevard, and along Yaquina View Elementary on SE Harney and 2nd Streets.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents