Similar Projects
Centrifugal Dewatering 12" x 8" Self-Priming Pumps - Trailer Mounted
Bidding
FL

Construction of Water Treatment Plant High Service Pumps
Bidding
$2,000,000 est. value
Lantana, FL 33462

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Purchase and Delivery of Grinder Pump with Accessories, Assembled, (Duplex Pump System)
Post-Bid
West Palm Beach, FL 33415

Salt, Brine, and Anti-Icing or De-Icing Agents, and Brine Production and Storage Systems
Results

Broadway and Blue Heron Block Redevelopment Project
Results
Riviera Beach, FL 33404

Wawa # 5350 - Site Development
New Construction, Demolition
Construction
Lake Worth, FL 33463

Lifetime Fitness - Site Development
New Construction
Construction
$1,268,511 est. value
Palm Beach Gardens, FL 33410

Raw Watermain Improvements for Surficial Aquifer (SA) Wells 8A-12A and Site Demolition for SA Wells 6-12 (W1817B)
Bidding
Jupiter, FL 33458

Safe Harbor Marina @ North Palm Beach
Renovation
Post-Bid
North Palm Beach, FL 33408

Tank Cleaning Services, Wastewater Treatment Plants, Term Contract
Term Contract
Results
West Palm Beach, FL 33437

Home Depot Site Work at Alton
New Construction
Construction
Palm Beach Gardens, FL 33418

CVS # 7891 - ADA Exterior Improvements
Renovation
Post-Bid
$15,000 est. value
Lake Worth, FL 33467

Cleaning and Inspection of Potable Water Storage Tanks
Results
Jupiter, FL

FPL Okeechobee Transmission Corridor
New Construction
Construction
$1,685,000 est. value
West Palm Beach, FL 33409

Last Updated 06/29/2020 12:38 PM
Project Title

Construction Moss Pilot Project

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL   (Palm Beach County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Pumps and Wells, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction includes mobilization, clearing and site preparation, the purchase and installation of a new or used 25 CFS stormwater pump, new 500 gallon above-grade fuel storage tank and appurtenant structures, 36" DIP piping, intake screen, diffuser and riprap, access road stabilization and restoration of the site. Work also includes the installation of three (3) 18-inch stilling wells/monitoring platforms.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents