Similar Projects
Last Updated | 01/08/2024 11:10 AM |
Project Title | Water Infiltration Repairs at DPH Lab 395 West Main Street Rocky Hill |
Physical Address | View project details and contacts |
City, State (County) | Rocky Hill, CT 06067 (Hartford County) |
Category(s) | Laboratory |
Sub-Category(s) | Laboratory |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Results, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,273,429 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of November 22, 2023, the project has not been awarded as bids are still under evaluation. A timeline for award has not been confirmed. Project Location: 395 West Main Street, Rocky Hill, CT The Commissioner of the Connecticut Department of Administrative Services reserves the right to do any of the following without liability, including but not limited to: (a) waive technical defects in the bid proposal as he or she deems best for the interest of the State; (b) negotiate with a contractor in accordance with Connecticut General Statutes Section 4b-91; (c) reject any or all bids; (d) cancel the award or execution of any contract prior to the issuance of the "Notice To Proceed"; and (e) advertise for new bids. Contractor or Sub-Contractors performing the work must have 5 years minimum experience with air vapor & weather barriers, metal wall panels, specified roof systems, concrete coatings, electrical and 10 years minimum experience with roof drain installation. Roofing contractor or sub-contractor must be an authorized Carlisle EPDM installer and an authorized Firestone TPO installer Bidding Limited To: Contractors Prequalified by DAS for General Building Construction (Group A) All Project Questions, Bid Questions, and Pre-Bid Equals and Substitution Requests must be submitted fourteen (14) Calendar Days prior to the Bid Due Date. All Project Questions and Pre-Bid Equals and Substitution Requests must be emailed (not phoned) to the Architect/Engineer with a copy to the Construction Administrator and the DAS/CS Project Manager listed below. Architect/Engineer: Gale Associates, Inc. Email: mal@gainc.com Construction Administrator: TBD Email: TBD DAS/CS Project Manager: Michele Helou Email: Michele.Helou@ct.gov All Bid Questions must be emailed to the DAS/CS Paralegal Specialist listed below. DAS/CS Paralegal Specialist: Alison Kulas Email: Alison.Kulas@ct.gov Prevailing wages are required on this project, in accordance with the schedule provided in Section 00 73 44 Prevailing Wage Rates, pursuant to Connecticut General Statutes (C.G.S.) Section 31-53 (a) through (h), as amended. Each contractor who is awarded a contract on or after October 1, 2002 shall be subject to provisions of C.G.S. 31-55a concerning annual adjustments to prevailing wages Set-Aside Requirements: SBE Subcontractors &/or Suppliers: 25%; MBE Subcontractors &/or Suppliers: 6.25% Liquidated Damages: $ 1,252.00 Per Calendar Day Beyond Substantial Completion. $ 1,252.00 Per Calendar Day Beyond 90 days After Substantial Completion. Contract Time Allowed: Calendar Days: 112 Construction Costs: Greater Than $500,000 Cost Estimate Range: $ 2,016,770.00 To $ 2,124,717.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |