Similar Projects
East West Connector Roadway Safety Improvements - 2-217 - City of Smyrna
Infrastructure
Conception
$2,170,000 est. value
Smyrna, GA 30082

Windy Hill Parkway Improvements - 2-218 - City of Smyrna
Infrastructure
Conception
$1,230,000 est. value
Smyrna, GA 30080

South Cobb Drive Convenience Store
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Marietta, GA 30060

St. Benedict Episcopal School Middle School Classroom Building
New Construction, Infrastructure - 50,000 SF
Design
$7,000,000 CJ est. value
Smyrna, GA 30080

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

4.503 Miles of Widening and Reconstruction on SR 92 (Dallas Acworth Hwy) Beginning at Old Burnt Hickory Road and Extending To US 41/ SR 3(Cobb Pkwy)
Infrastructure
Results

CDBG - Sidewalk Improvements in Woodland Acres Subdivision
Infrastructure
Results
$200,000 est. value
Kennesaw, GA 30152

Brownsville Road Mixed-Use Development
New Construction, Infrastructure - 12,000 SF
Construction
$48,000,000 CJ est. value
Powder Springs, GA 30127

Brownsville Road Mixed-Use Development
New Construction, Infrastructure - 12,000 SF
Construction
$48,000,000 CJ est. value
Powder Springs, GA 30127

Space Shop Self Storage / Marietta
Addition, Demolition, Renovation, Infrastructure - 33,800 SF
Pending Verification
$20,000,000 CJ est. value
Marietta, GA 30066

Better Baseball Two
New Construction, Infrastructure - 15,000 SF
Pending Verification
$2,500,000 CJ est. value
Marietta, GA 30060

Lockheed Martin Wastewater Tie-On Modified - Phase 1
Infrastructure
Conception
$1,000,000 est. value
Marietta, GA 30060

Noonday Creek Trail Extension FM SR 92 to Noonday Creek Park
Infrastructure
Design
$5,000,000 CJ est. value
Kennesaw, GA 30144

RFP D/B - Design and Installation of New Signage for CobbLinc
Infrastructure
Post-Bid
$200,000 CJ est. value
Marietta, GA 30060

Last Updated 12/15/2023 01:14 PM
Project Title

Lower Roswell Road Safety and Operational Improvements

Physical Address View project details and contacts
City, State (County) Marietta, GA 30068   (Cobb County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $7,030,505 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of various improvements on Lower Roswell Road, from Woodlawn Drive to Davidson Road, which include realignment of a segment of roadway, turn lanes, medians, bicycle lanes, sidewalk to the north side and a multi-use trail to the south side. Cobb County Water System Work is also included in this project. Project Duration: The time allowed for performance of the project will be 730 days from issuance of Notice to Proceed. Bid Bond shall be drawn in favor of the Board of Commissioners, Cobb County, Georgia, in the amount of five percent (5%) of the bid for the complete work. The time allowed for performance of the project will be 730 days from issuance of Notice to Proceed. The Cobb County Board of Commissioners reserves the right to reject all bids and to waive formalities. Any claims for cost incurred by any Bidder in preparation of any part of or total package for this project will not be considered for reimbursement by Cobb County.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents